Stop and wait flow control protocol, Electrical Engineering

Assignment Help:

(a) Explain what asynchronous transmission is and give two advantages and two disadvantages of using this type of transmission.

(b) One of the goals of multiplexing is efficiency.

(i) Explain what is multiplexing and how does it improve system design.
(ii) Give any two applications of Frequency Division Multiplexing (FDM).
(iii) Ten signals, each requiring 4000 Hz are to be multiplexed together using

FDM. What is the minimum bandwidth of the link if there is a need for a guard band of 400 Hz between the channels to prevent interference?

(c) Explain the operation of the Stop and Wait flow control protocol and give one disadvantage of using this protocol.

(d)  Two adjacent nodes (A and B) use a  sliding window protocol  and a 3-bit sequence number. As the  ARQ  mechanism,  Go-Back-N  is used and the window size is 4. Assuming that  A transmits and B receives,  by using appropriate diagrams  and giving appropriate explanations,  show the window positions for the following succession of events:

(i) Before A sends any frames.

(ii) After A sends frames 0, 1, 2 and B acknowledges 0, 1 and the ACKs are received by A.

(iii) After A sends frames 3, 4, 5 and B acknowledges 4 and the ACK is received by A


Related Discussions:- Stop and wait flow control protocol

Define the tick of the property, Tick of the property, which is different f...

Tick of the property, which is different from the group (A) Ductility.                (B) Resistivity. (C) Tensile strength.   (D) Hardness. Ans: Tick of the pr

Realize the function f by a k map using 0s, Q. Given the following truth ta...

Q. Given the following truth table: (a) Realize the function f by a K map using 0s. (b) Realize the function f by a K map using 1s.

PLC Programming, FIG. 2 Car Park Simulation Consider the above diagram, FI...

FIG. 2 Car Park Simulation Consider the above diagram, FIGURE 2, of the car park. The object of this assignment is to write a program to operate the barriers to allow the cars in

Phantom or fictitious loading method, Phantom or Fictitious Loading Method ...

Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and

Calculate the armature current, A DC shunt motor rotating at 1560 RPM is su...

A DC shunt motor rotating at 1560 RPM is supplied from a 240-V source. The line current supplied to the motor is equal to 27 A. The shunt field resistance of the motor is equal to

Determine the mechanism of generation of the voltage, (a) Identify the semi...

(a) Identify the semiconductor type in the above diagram. (b) Explain the mechanism of generation of the voltage V AB in the above diagram. (c) An experimental setup like th

Find the rms induced voltage, A two-pole, three-phase, 60-Hz, wye-connected...

A two-pole, three-phase, 60-Hz, wye-connected, round-rotor synchronous generator has N a = 12 turns per phase in each armature phase winding and flux per pole of 0.8Wb. Find the r

Laser beam machining and electron beam melting, Differentiate between LBM a...

Differentiate between LBM and EBM process on the basis of application and limitations.

Interpretation and analysis using remote sensing, Q. Interpretation and ana...

Q. Interpretation and analysis using remote sensing? Interpretation and analysis using remote sensing Various characteristics of a river can be understood by studying its planf

Display the segment on the pic trainer, Aim: The aim of this practical ...

Aim: The aim of this practical is to work with multiplexed 7-segment displays and implement a counter and display the 7- segment on the PIC trainer. Equipment: PIC

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd