State the ultimate load capacity of the pile group, Civil Engineering

Assignment Help:

A group of 16 piles of 50 cm diameter is arranged with a centre to centre spacing of 1.0 m. The piles are 9 m long and are embedded in soft clay with cohesion 30 kN/m2. Bearing resistance may be neglected for the piles-Adhesion factor is 0.6. State the ultimate load capacity of the pile group.

 


Related Discussions:- State the ultimate load capacity of the pile group

Diffrence between concrete road and bituminous road, Q. Diffrence between C...

Q. Diffrence between Concrete road and bituminous road? Concrete road belongs to rigid pavement and they don't deflect under traffic loads. Quite the reverse, bituminous pavem

Illustrate weld failures in track, Q. Illustrate Weld Failures in Track? ...

Q. Illustrate Weld Failures in Track? These are failures occurring to defects in welding the joint. These defects are either because of improper composition of thermit metal or

Statics, Currently I am struggling with masteringengineering.com So is it f...

Currently I am struggling with masteringengineering.com So is it fine to give you my username and password so you could solve my problems. please show your work.

Roads construction in marshy land, precaution to be taken for roads constru...

precaution to be taken for roads construction in marshy land

Compute the thermal stresses in steel, Compute the thermal stresses in stee...

Compute the thermal stresses in steel: Consider the compound bar shown in below figure consisting of a steel bolt of diameter 18 mm, surrounded through a copper tube of outer

Test leakage of constructed gravity pipelines, Question Have air test o...

Question Have air test or water tests be selected to test leakage of constructed gravity pipelines ? Answer For gravity pipes, air tests are carried out after completi

Illustrate truss with k-bracing, Q. Illustrate Truss with K-bracing ? I...

Q. Illustrate Truss with K-bracing ? In the arrangement of triangulated framework in truss structures, it's more economical to design longer members as ties whereas shorter one

Civil engineering drawing, Explain step by step procedure involved in the a...

Explain step by step procedure involved in the analysis and design of balanced cantilever bridge.

Tack coat – emulsified asphalts vs cutback asphalts, Tack coat - emulsified...

Tack coat - emulsified asphalts vs. cutback asphalts Emulsified asphalt is a suspension of asphalt in water by employing an emulsifying agent that imposes an electric charge o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd