State the term - total loss of prestress, Civil Engineering

Assignment Help:

Total loss of prestress

The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for that member. As the types of construction of pre and post-tensioned concrete members are different, same total loss of prestress does not occur in both of them. 


Related Discussions:- State the term - total loss of prestress

Settlement due to lowering of water table, Q. Settlement due to Lowering of...

Q. Settlement due to Lowering of Water Table? Water table is encountered with, whenever any excavations are made for foundations. The water is to be out for working conditions.

Fluids, FLUID substance which deforms continuously when subjected to a shea...

FLUID substance which deforms continuously when subjected to a shear stress  LIQUID no fixed shape deforms under gravity to container shape virtually incompressible = const

Expansion joints in basement, I have building 50 m * 53 m 3 floors without ...

I have building 50 m * 53 m 3 floors without expansion joint in basement what are opinion please ? thanks

What do you mean by stock verification sheets, Q. What do you mean by Stock...

Q. What do you mean by Stock Verification Sheets? The proper custody and accountal of stores is the prime duty and function of an executive or the stockholder. To ensure this v

Minimisation of differential settlement, Minimisation of Differential Settl...

Minimisation of Differential Settlement You are aware that differential settlement causes more distress to the structure, when compared with that of total settlement. The var

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Dam, Check for stability in a dam

Check for stability in a dam

Can you determine the quantity of apron stone, Q. Can you determine the Qua...

Q. Can you determine the Quantity of apron stone? Quantity should be sufficient to cover the scoured face down to maximum depth of scour obtained using scour factor c of 2.5 at

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd