State the effect of the induction of the pre-stresses, Civil Engineering

Assignment Help:

State the effect of the induction of  the pre-stresses

The net effect of the induction of  the pre-stresses shall be to decrease the tensile stresses (produced due to the external loads on the beam element) at the bottom side of beam and to increase the compressive stresses (produced due to the external loads on the beam element) at the top side of  the beam. Though these pre-stresses shall have a positive effect in the form of
decrease of  tensile stresses (against which  the concrete is weak) at the bottom side, these may  lead to increase of compressive stresses to an extent that the concrete may, instead, fail in compression at the top side of beam. 


Related Discussions:- State the effect of the induction of the pre-stresses

Find the length of the chord, Q If the degree of curve is defined by the a...

Q If the degree of curve is defined by the angle at the center subtended by an arc (or chord) 20 meters, find the length of the chord in meters so that the versine measured in cm

Chemistry, discuss various chemical reactions involved in lime soda process...

discuss various chemical reactions involved in lime soda process ?

Structural drawing, Overview   A structure is required to support a conv...

Overview   A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural s

Question, The state of stress at a point is given by the stress components ...

The state of stress at a point is given by the stress components sx = 70 MPa, sy = 10 MPa and ?xy = - 40 MPa. Using Mohr''s circle, find (i) Principal stresses, and (ii) Principal

Passenger terminal building, Passenger Terminal Building: Importanc...

Passenger Terminal Building: Importance In a civil airport, the passenger terminal building is the centre of all activities. It services both inbound and outward boun

Cost estimating, I would like to know if anyone can help me with my const e...

I would like to know if anyone can help me with my const estimating project

Describe about the baur-leonhardt system, Describe about the Baur-Leonhardt...

Describe about the Baur-Leonhardt system The Baur-Leonhardt system is included in the third type of anchorages which work under the principle of looping tendon wires at the en

What do you mean by stock verification sheets, Q. What do you mean by Stock...

Q. What do you mean by Stock Verification Sheets? The proper custody and accountal of stores is the prime duty and function of an executive or the stockholder. To ensure this v

Explain precedence relationships - construction management, Explain the Pre...

Explain the Precedence Relationships a. Finish-to-Start - the most common, the predecessor activity must finish before the successor activity can start b. Finish to Finish

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd