Staircase, Civil Engineering

Assignment Help:
The Figure 1 below shows a section through a stairway for a garage in a new proposed dwelling. The stairway is 3 meters wide with 300 mm wide treads(7 treads) and 170 mm high risers(8 risers)The landing(1 landing) and the staircase waist thicknesses are 170 mm. A finishes of 20 mm thick screed will be provided. The characteristic strengths of the materials used are: = 20 MPa = 450 MPa for reinforcement. Use a 20 mm nominal cover to reinforcement and Y12 bars. 3.1 Use the relevant codes of practices to design suitable reinforcement for the stairway to resist the applied loads. 3.2 Design the shear links. 3.3 Check the deflection 3.4 Design the transverse reinforcement

Related Discussions:- Staircase

Postensioning in raft foundation, how can we post tension a raft foundation...

how can we post tension a raft foundation? what design procedure should we follow to post tension raft foundation in order to decrease the concrete and steel volume and increase th

Mechanical, Define varigions principle of moments and write about system of...

Define varigions principle of moments and write about system of forces?

Maintenance of earth roads, Maintenance of Earth Roads: The main task...

Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and

Mechanics, What is the parallelogram law of force and prove it?

What is the parallelogram law of force and prove it?

Simple stresses and strains, Simple stresses and strains: In this simp...

Simple stresses and strains: In this simple stresses and strains you have learnt the concepts of stress, strain, elastic modulus and the primary concepts in application to ana

High strength friction grip bolts and normal bolts, High strength friction ...

High strength friction grip (HSFG) bolts vs. normal bolts HSFG bolts have the following benefits when compared with normal bolts: (i)  Performance of preloaded HSFG bolts u

Example for productivity analysis and improvement, Example for Productivity...

Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day.  The job site

Reinforced Concrete Design, design a 3-meter cantilever slab to carry a uni...

design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd