Scenario:
You are a member of the Project Review team for CK Software Services. At the next meeting, the team will discuss the scheduling for the new automated teller machine (ATM) software the company is building. You have been selected to lead the team that will develop the Financial Transactions (FINAT} module based upon the architecture decomposition (ADV) shown in Figure 5.4 on page 178 and the Work Breakdown Structure ( WBS) shown in Figure 5.5A and Figure 5.5B on pages 179-180. The estimates for the detailed tasks are shown below for your convenience.

Prepare the preliminary schedule by completing each of the following.
1. Choose the development model being used for the FINAT project. State the name of the development model/process.
2. Define where you would place the milestones for the FINAT project and prepare a milestone list using a structure similar to Table 5.5 on page 189. Remember that this is part of a larger project where the top-level architecture decomposition (ADV) has been determined. You must then include consideration of how your FINAT project fits into the overall project. That means you need to include one or more milestones that will enable your project to smoothly integrate into the ATM project.
3. Prepare a critical path activity network for the tasks showing the information listed below. Figure 5.6 on page 189 shows an example. You may use Microsoft Project, Visio, or another appropriate drawing tool. The critical path activity network is a directed graph showing the milestones as nodes in the graph with directed edges showing the workflow.
a. Milestones that you identified in #2 above.
b. Concurrent and sequential tasks as needed for your development model/process.
c. Include the individual tasks with the duration for each (shown in parentheses on each edge of the graph). Label each edge with the task “number” and duration.
d. Calculate and state the total number of weeks in the schedule.
e. Identify the critical path by showing the edges in a different color or with a “bold” edge symbol.
4. Prepare a week-by-week staffing profiles for the FINAT project as listed below. Show each in a separate table. Figures 5.11 and 5.12 on page 197 show example profiles for EST and LST calculations.
a. Prepare a staffing profile that gives the most-ideal staffing plan you can devise. That is, arrange your projects so that you satisfy the required workflow but have the most constant staffing plan. The ideal staffing profile is shown in Figure 5.13 on page 198.
5. Extra Credit: Prepare 3 Gantt charts for the FINAT project, one that show the schedule to accomplish each staffing profile.



Detailed Task Estimates (Refer to Figures 5.5A and 5.5B on pages 179-180)
Task Number of Staff Duration in Weeks
3.2.1.1 2 2
3.2.1.2 1 3
3.2.1.3 2 2
3.2.2.1 2 4
3.2.2.2 3 5
3.2.2.3 2 3
3.2.3.1 1 2
3.2.3.2 2 2
3.2.3.3 1 3
3.2.4.1 3 1
3.2.4.2 2 3
3.2.4.3 2 1
3.2.5 4 3

Related Discussions:- software project

Project value - measure for project management value, P roject value T...

P roject value The organisations add value to the business through the series of processes. Increasingly such processes are usually undertaken within the context of the projec

Greater possibility of space utilization, Greater Possibility of Space Util...

Greater Possibility of Space Utilization There will be a greater productive utilization of the floor area under this type of layout. Due to lesser need for temporary storage o

Cost benefit analysis, How to determine which project have larger net benef...

How to determine which project have larger net benefit between two projects

What are the approaches to allocate factory overheads, What are the approac...

What are the approaches to allocate factory overheads? Product costing allocation methods - Plant wide allocation, Department allocation, Activity based allocation

Graphs, G raphs The purpose of graphs is to organise, summarise and di...

G raphs The purpose of graphs is to organise, summarise and display data. The different types of graphs are line graphs, bar graphs, and circle graphs. The steps involved in p

Areas of business excellence, A reas of Business Excellence Typically,...

A reas of Business Excellence Typically, we think about business excellence in the terms of superiority, but in practice, it is frequently translated into features of the busi

Family Planning, Dr. Adinombe Watage, deputy director of the Family Plannin...

Dr. Adinombe Watage, deputy director of the Family Planning Research Center in Nigeria’s Over-the-River Province, was assigned the task of organizing an training five teams of fiel

Explain force field analysis techniques, Question 1: Choosing a social ...

Question 1: Choosing a social project of your choice, use the SWOT analysis and Force Field Analysis Techniques to scope the project explaining what are feasible and what are n

Risk management techniques and project timeplan creation, I have an assignm...

I have an assignment to submit in the above mentioned topics. Please respond me as soon as possible with the required info and i will send you the assignment details after our mutu

Illustrate the examples of work and cost breakdown structure, Illustrate th...

Illustrate the examples of Work and Cost breakdown structure, which can aid budgeting planning? Illustrations of how WBS or CBS can aid budgeting planning: • Staff hours for

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd