The factory has the process for the following:  QC of sampling,  receiving orders,  receiving fabrics and accessories,  checking of fabrics,  drawing,  cutting,  sorting,  sewing, pressing,  quality Control,  packing and delivery.  

414_Analysis.png

As the factory was originally designed for in-house production, it has some problems in adjusting the processes according to the new and demanding requirements.  Further it was also noted that the factory is completely lacking proper planning and scheduling of all the activities.  There are bottlenecks in resource allocation for various process units.  For example, the unit need to go to the regular production unit for fixing accessories and for pressing for sampling processes. This, not only delays the sampling unit, but also interrupts the regular production processes.  Sewing accessories has to be interrupted and machines have to be re-adjusted for sampling to meet the current regular production processes.

357_Analysis1.png

Comparing the problems with theory and practical processes.

Need to discuss on standard production planning and the difficulties in adopting the standard practices.  The factory needs to verify the standard garments production time using standard process time.  It requires reviewing the resources allocated at various processes and readjusting the resource requirements.  For example, it is possible to reduce the ideal time in adjusting the machines that are doing regular production by increasing one more worker and introducing one more sewing machine for the sampling unit.


Related Discussions:- Analysis the production in manufacturing company

Critical path method, HyperAV is a Manchester based company which is a reta...

HyperAV is a Manchester based company which is a retailer of home cinema equipment. They sell a variety of products including speakers, amplifiers, Blu-ray/DVD players and cables.

Research reports and design documents, Project management-related deliverab...

Project management-related deliverables: business case, charter, team contract, scope statement, WBS, schedule, cost baseline, status reports, final project presentation, final pro

Steps of process planning procedure , Steps of Process Planning Procedure ...

Steps of Process Planning Procedure Step 1 Selection of Process: A process is necessary in order to shape form condition and join materials and components with the help of mac

Explain about the work breakdown structure, Explain about the work breakdow...

Explain about the work breakdown structure. Work breakdown structure (WBS): The concept of work breakdown structure (WBS) is to assist plan effectively for a project by b

Matrix organisation structure, M a t r i x organisation A matrix o...

M a t r i x organisation A matrix organisation is a combination of functional and project organisation. A weak matrix organisation has most of the characteristics of a fun

Project management and information security, Importance of Project Manageme...

Importance of Project Management as it relates to Information Security Program: Information security means protecting your information and data from unauthorised access, discl

What types of errors disclosed in trial balance, What types of errors discl...

What types of errors disclosed in Trial Balance? A Trial Balance discloses the given types of errors as illustrated follows: a. An item posted two times. b. A mistake int

How much time should planning take, Q. How much time should planning take? ...

Q. How much time should planning take? T imes taken for individual projects differ considerably frequently due to circumstances beyond the project manager's control such as ch

Performance problem or challenge, • You also found that over the past 6 mon...

• You also found that over the past 6 months, the Senior Leadership had been very proactive in their attempt to drive a much different strategic vision and had communicated strong

How to measures customer satisfaction for the product, Quality ultimately i...

Quality ultimately is calculated in terms of customer satisfaction.) Surveyed before product delivery and after product delivery (and on-going on a periodic basis, using standar

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd