The design of the control rooms in any plant is very important. The control room operator(s) must be able to control and manage safety and production critical emergencies efficiently and effectively to ensure that the plant can be shutdown and vented safely, ensure that fire control and mitigation efforts are initiated and that evacuation can be accomplished if necessary.

The control room should be located next to a road. Control and shutdown system equipment rooms are also usually located adjacent to or nearby the main control room.

On a large facility it may be necessary to have an emergency control room separate from the main control room to serve as a backup for these functions, if the main control room is not available. This room may also serve as the emergency command center.

Single unit control rooms, located within a process unit, are not recommended for new plants but may be present in older existing plants.


Related Discussions:- Show the design of the control rooms

What are the two ways of pile foundation, What are the two ways of pile fou...

What are the two ways of pile foundation Pile foundations can be installed in two ways. Timber, steel and precast concrete piles, are driven from the ground using hammers till

Finite Element Analysis of Pressure Vessel, Need a basic explanation of how...

Need a basic explanation of how to go about doing a plane strain analysis of a pressure vessel

How to calculate total hysteresis loss?, Q.  The area of the hysteresis lo...

Q.  The area of the hysteresis loop of a given magnetic material is 50cm 2 with the two axes scaled as 1cm = 20AT and 1cm = 50mWb, for 50Hz frequency find the total hysteresis

Calculate change in internal energy of the gas, (a) Illustrate First Law of...

(a) Illustrate First Law of Thermodynamics for a Closed System undergoing a change of state and show that ‘Energy' is a property of the system. (b) A cylinder contains 1 m 3 of

Klein''s construction, what is the velocity and acceleration when connectin...

what is the velocity and acceleration when connecting rod and crank are mutually perpendicular?

What is interference, a) What is Interference and show the relation for the...

a) What is Interference and show the relation for the minimum number of teeth required for a wheel. b) Show the relations for Maximum length of path of contact and Maximum lengt

Modulus of elasticity, Explain Young's Modulus or Modulus of elasticity? ...

Explain Young's Modulus or Modulus of elasticity? Sol. : It is ratio between tensile stress and tensile strain or compressive stress and compressive strain. It can be denote

State Initial graphics exchange specifications, Initial Graphics Exchange S...

Initial Graphics Exchange Specifications (IGES) The basic concept of IGES is concerned with the exchange of product description data from one CAD system to another one. The CAD

Temporary stone scuppers - culverts, Temporary Stone Scuppers: In hil...

Temporary Stone Scuppers: In hill roads, it is customary to cut the roads from the hill-face and to open up the road immediately thereafter to traffic. Further improvements s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd