Q. Scope of work for a project in Mechanical Engineering?
The Mechanical Engineering scope of work for a project involves the design and specification of mechanical equipment and piping systems to a level of detail adequate for the procurement and construction of the Client's facility. Mechanical equipment and piping systems, as referenced above, can be further defined as Stationary Equipment, Rotating Equipment, HVAC systems, Piping Engineering, Piping Stress Analysis and Metallurgical Engineering. This work is normally coordinated by a Project Manager/Engineer who will provide a Project Execution Plan (PEP), a list of deliverables and a schedule for all disciplines. The Mechanical Lead will review and comment on these items. Unresolved discrepancies shall be reviewed with the Mechanical Engineering Department Head.
i wanna know is production job is best or marketing after doing btech
Determine the stresses in the shell: A thin spherical shell of 1.5 m diameter & 8 mm thickness is filled having a liquid at an internal pressure of 1.5 N/mm 2 . Determine the
A cantilevered beam is to be made of 7075-T6 aluminum with a uniaxial yield strength of 469 MPa. The beam is 1m long, and is loaded with the following limit loads: a bending mome
alongation of conical bar due to its self wait
Characteristics of the secondary circuit The dimensions of the secondary circuit in secondary loop determine to a large extent, the performance of these machines. The secondary
This section covers welding of pressure parts including those non-pressure parts when welded to pressure parts. All welding design functions necessary within the contract shall be
Once vendor drawings are received and piping isometric drawings are prepared, the Mechanical engineer will provide a final stress package to the stress engineer per The stress a
I have 5000 kg boiler capacity. In flow of 1 m3 gas flow how much steam I can produce
logical design of process planning
advantages and disadvantages of kanban
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd