The conditions necessary for sustained oscillation can be summarized as follows:
1. There should be a positive feedback.
2. The loop gain of the circuit must be equal to or greater than 1 i.e. Aβ<=1.
3. The phase shift around the circuit must be zero or 360 degrees.
The non-sinusoidal oscillation at steady state can happen at 2 states:
1. β is not exactly 1.
2. Due to saturation.
And α decimal signal or noise voltage can provide a measurable output voltage and the circuit can act as oscillator even without an input signal.
Q. Show Noise and Stability of operational amplifier? Noise This refers to the small, rapidly varying, random spurious signals generated by all electronic circuits. Noise
how to design load forecasting
Question 1: (a) Outline the architecture of MIT's iLabs. Design a diagram supporting your explanation. (b) Give advantages/disadvantages of the MIT Microelectronics iLabs wi
Q. What do you mean by digital systems? Electronics information is generally placed into two categories as digital and analog. The Digital information is represented in discret
Q. Binary Coded Decimal Addition Now as in conventional decimal addition, Binary Coded Decimal addition is performed one decimal digit at a time. What happens when the sum g
what is the daily life work of triac
Give the properties and application of glass. Glass - It is an inorganic material made by the fusion of various metallic oxides. The properties of glass are as - Glass is
Define phase quantity
Interpreter- High level language The interpreter is a program which translates the high level program into objects program statement wise . it reads one statement of
Its not essential that a power plant uses only two rectifiers, it depends on the load there at the site and the capacity of the rectifier or SMPS. Assume the load at the site is 12
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd