Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Scraper Launchers and Receivers?
Scraper launchers and receivers associated with the pipelines shall be located in open, well-ventilated areas with the opening directed away from pressurized or other critical equipment, where practicable. Mechanical handling facilities shall be provided for spheres, scrapers (also commonly known as "pigs") and line logging devices.
Elevations, relative to grade, of launchers and receivers shall be kept to a minimum, but shall be of sufficient height to allow contents of drain lines to be observed. Launcher and receiver areas are located close to the main pipeline entry and exit points of the plant. The loading and unloading end of these units should point away from other facilities. This equipment should be within a curbed area with wash down facilities. As launchers and receivers are operated whilst adjacent plant is still 'live', safe spacing needs to be maintained.
Slug catchers are located close to the gas pipeline entry point to the plant and are designed to accommodate slugs of liquid that may be present in the gas supply. They can be either vessel type or for larger flows a multipipe type slug catcher can be utilized, both are generally above ground. The multipipe type can occupy a considerable plot area.
Both the launcher and receiver and slug catcher areas can have their own security fence. This can act as a physical code break between on-plot process and pipeline design codes.
Q. Explain about Vessel Design Loads? Vessels and their supports shall be designed for all of the following conditions: • Erection: dead weight of fully dressed, empty vesse
2*2
Q . Determine MI of unequal angle section 15cm × 10cm × 1.5cm with longer leg vertical and is flange upwards. Figure Sol. : A 1 = 10 ×
what is the average speed of travel in gas tungsten arc welding
Characteristics of a project
b. Assuming a 20 MW simple cycle gas turbine with a firing temperature of 1600K develop an analysis of a combined cycle. Assume that Tmax in the Rankine cycle is 560 C, Pmax = 60
A triangle ABC with vertices A (30,20), B(90,20), C(30,80) is to be scaled by a factor of 0.5 about a point X(50,40). Calculate :- (i) The composite transformation matrix; and
Can you prove an equation from Plane Stress and Plane strain?
What do you understand by PELE box and when it is utilized? Ans. The equipments required in PELE box are: i. HOLDER ii. TRIPOD STAND iii. BULBS iv. CROCODILE CLIP
as diesel engine gives more milege than petrol engine then why we are using petrol engine..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd