Q. Scraper Launchers and Receivers?
Scraper launchers and receivers associated with the pipelines shall be located in open, well-ventilated areas with the opening directed away from pressurized or other critical equipment, where practicable. Mechanical handling facilities shall be provided for spheres, scrapers (also commonly known as "pigs") and line logging devices.
Elevations, relative to grade, of launchers and receivers shall be kept to a minimum, but shall be of sufficient height to allow contents of drain lines to be observed. Launcher and receiver areas are located close to the main pipeline entry and exit points of the plant. The loading and unloading end of these units should point away from other facilities. This equipment should be within a curbed area with wash down facilities. As launchers and receivers are operated whilst adjacent plant is still 'live', safe spacing needs to be maintained.
Slug catchers are located close to the gas pipeline entry point to the plant and are designed to accommodate slugs of liquid that may be present in the gas supply. They can be either vessel type or for larger flows a multipipe type slug catcher can be utilized, both are generally above ground. The multipipe type can occupy a considerable plot area.
Both the launcher and receiver and slug catcher areas can have their own security fence. This can act as a physical code break between on-plot process and pipeline design codes.
Explain the Moment of resistance? Sol.: The two equal and unlike parallel forces, the lines of action of which are not same, form couple. The resultant compressive force ( P
Tee joints -The square tee joint requires a fillet weld that can be made on one or both sides. It can be used for light or fairly thick materials. For maximum strength, considerabl
Extension of auger in the main auger arrangement The original size of screw conveyer without auger extension is 2.5 m., which is same as size of chassis. Which to be attach wit
Find out the deflection at mid-span - cantilever beam: A double overhanging beam of 12 m length rests on supports symmetrically, 8 m apart. A load of 80 kN acts at one free en
graphical form of game theory
a couple can be balanced by a force equal to its magnitude?
Explain iron carbon diagram with all small details
In a nuclear power plant saturated steam at 30 bar enters a h.p. turbine and expands isentrophically to a pressure at which its quality is 0.841. At this pressure the steam is pass
We have a reciprocating compressor operating at 800 rpm. Suction pressure and discharge pressure are held constant by other systems that have nothing to do with the compressor. W
Construction of Lacashire boiler: CONSTRUCTION : Consists of boiler shell which contains water and steam. Diameter can vary from 1.75 to 2.75 m and length can be 7.25 - 9 m
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd