Q. Scraper Launchers and Receivers?
Scraper launchers and receivers associated with the pipelines shall be located in open, well-ventilated areas with the opening directed away from pressurized or other critical equipment, where practicable. Mechanical handling facilities shall be provided for spheres, scrapers (also commonly known as "pigs") and line logging devices.
Elevations, relative to grade, of launchers and receivers shall be kept to a minimum, but shall be of sufficient height to allow contents of drain lines to be observed. Launcher and receiver areas are located close to the main pipeline entry and exit points of the plant. The loading and unloading end of these units should point away from other facilities. This equipment should be within a curbed area with wash down facilities. As launchers and receivers are operated whilst adjacent plant is still 'live', safe spacing needs to be maintained.
Slug catchers are located close to the gas pipeline entry point to the plant and are designed to accommodate slugs of liquid that may be present in the gas supply. They can be either vessel type or for larger flows a multipipe type slug catcher can be utilized, both are generally above ground. The multipipe type can occupy a considerable plot area.
Both the launcher and receiver and slug catcher areas can have their own security fence. This can act as a physical code break between on-plot process and pipeline design codes.
A steel pipe with 50 mm OD is covered with a 6.4 mm asbestos insulation followed by a 25 mm layer of fiber-glass insulation [K = 0.0485 Wmk]. The pipe temperature is 393 K and the
A piston-cylinder assembly fitted with a paddle wheel contains air, initially at p1=30 lbf/in2, T1=540 °F, and V1=4 ft3. The air undergoes a process to a final state where p2=20 lb
Q. Vessels resting on concrete foundations? For vessels resting on concrete foundations, the allowable concrete bearing stress shall be 750 psi (5 MPa). The design loadings fo
Find out Moment of Inertia of circular area: Find out Moment of Inertia of circular area of radius a = 10 cm about its centroidal axis OX as illustrated in Figure Sol
when does the cyclic service apply for pressure vessels in batch plant (operation)
Determine the net work: Q: 5 m 3 o f air at 2 bar, 27°C is compressed to 6 bar pressure following PV 1.3 =C . It is expanded subsequently adiabatically to 2 bar. C
(a) Describe clearly the constructional details and operation of various rear axle drives with the engine placed at the front. Illustrate your answer with simple and neat sketch.
Metals and Melting Practices - Ladle, Limestone,Ore,Sinter Ladle : A big bucket utilized as a carrier for molten metal. Limestone : A Blast Furnace raw material that elimi
Plate : These are also known as electrodes. There are two types of group of plates - Positive and Negative. Each group contains more than one plate. A group of positive plates is
Condenser ( Capacitor ) : A capacitor is used to store the electrical energy. The maximum value of stored energy depends on its capacity. It helps to achieve required high voltag
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd