Which will be a better choice, a large diameter piles or a scheme of some smaller piles with same load capacity?
Answer
Choice of a large diameter pile suffers from drawback that severe consequences would occur in case there is setting out error of pile. Furthermore, in terms of rate consideration, for same load capacity cost of a group of small diameter piles is normally lower than that of a large diameter pile. On other hand, for small diameter piles such as mini-piles, they are valuable in site locations with limited headroom and space. In adding up, in a little structure with only a few piles, it is uneconomic as of its high mobilization charge.
pentavalent will be added impurity
Q. Determine Length of guide bunds? Length of a guide bund has to be such that the flow approaching even from behind the guide bund would pass through the bridge with minimum obl
First Can I use this device to test concrete specimen? Second it is very important for me that wouldn’t have tensile strength when I want to fix specimens. Because the specimens su
layout of harbour
by estimation
If you have never used an ice dam melting sock on your roof before, you will search that they give an inexpensive method for removing roof ice dams and improving your home's heatin
Define Seismic Isolation Bearings - Bridge Bearing? Many bridges had been built before the proper seismic design specifications were known to us. These bridges require strengt
a lighthouse standing on the cliff observed from two open boats A and B in a vertical plane thourgh the lighthouse.the angle of elevation of the top of the lighthouse viewed from B
Road Location in Dune Areas: The following principle should be observed in locating a road in dune areas : (a) Align a road where sand is covered by vegetation. (b) Sel
1. What take place when float or slack of an activity is positive Ans: It represents a situation where extra resources are available and the completion of the project is not de
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd