Define continuity equation, Civil Engineering

Assignment Help:

Define Continuity Equation

Mass in fluid systems is always conserved.  

Ρ1v1 = ????2v2  

If the fluid density is the same at both points in the flow, the continuity equation becomes:

Ρ1v1 = Ρ2v2


Related Discussions:- Define continuity equation

Asdasd, #questiasdasdasdasdon..

#questiasdasdasdasdon..

Stress analysis, • The previous load analysis represents a first and necess...

• The previous load analysis represents a first and necessary step in the analysis of the given structure but it does not tell us whether the given load can be safely supported (i.

Define fatigue load test of shock transmission unit, Define Fatigue load te...

Define Fatigue load test of shock transmission unit? This test was carried out for 100,000 cycles for maximum capacity of STU, assuming the worst case that the 'Lock Up Load' i

By which materials shank of a spur construct, Q. By which Materials Shank o...

Q. By which Materials Shank of a spur construct? Shank of a spur is constructed of sand core and its exposed faces are protected by stone pitching. The attack at nose is very h

Neglecting bearing at the tip of the piles, A square pile group of 9 piles ...

A square pile group of 9 piles of 25 cm diameter is arranged with a pile spacing of 1m. The length of the piles is 9 m. Unit cohesion of the clay is 75 kN/m 2 . Neglecting beari

Determine the variation of safe bearing capacity of soi, State the algebrai...

State the algebraic equations showing the variation of safe bearing capacity of soil (for clay and sand to be given separately) in shallow foundation with: (i) depth of foundati

Wmm, why use wmm upon gsb can be laid dbm directly upon gsb

why use wmm upon gsb can be laid dbm directly upon gsb

Seismic joints, is the seismic joints like falling joints ? thanks :)

is the seismic joints like falling joints ? thanks :)

Design nominal reinforcement to piles, Question Is it true that there i...

Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce

Cross sectional area to be excavate for roadway construction, The Table pro...

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd