Q. Safety considerations in multi-unit plants?
Segregation of process units within large or multi-unit plants is necessary in order to reduce the risk of a fire spreading. This is normally achieved by providing fire breaks of at least 6m (20 ft.) in width approximately every 60m (200 ft.) either by means of access ways or through equipment layout considerations. These roads should preferably surround the unit to provide good fire-fighting access. Fire-fighting access is not normally provided through the unit or under unit pipe racks. Toxic, acidic and dusty equipment within the plant should be separated by grouping items handling similar commodities together often within a curbed area.
Ideal access to most process areas should generally be from upwind and a higher elevation. Secondary access should preferably be from a crosswind direction.
Firewater ring mains with post-indicator isolating valves usually surround the units, and supply hydrants and monitors. Where fixed foam installation is required the foam making tanks are usually located close to the point of application. In some remote locations where water for fire-fighting is scarce, increased spacing between process plant facilities may be required. Other fire protection criteria such as active versus passive methods need to be considered, as space around equipment may need to be reserved for deluge and sprinkler systems.
When equipment handling low flash point media, including flammable gases, is grouped together, its implication on the classification of the hazardous area needs to be considered.
Given: A brittle material has an ultimate tensile strength of 300 MPa and an ultimate compressive strength of -1000MPa. Assume that failure can be represented by the Modified
Instantaneous stress and elongation: What shall be the instantaneous stress & elongation of a 25 mm diameter bar, 2.6 m long, suspended vertically, if any mass of 10 kg falls
difference between blow hole and porosity
A tank has two identical orifices in one of its vertical sides. The upper orifice is 3m below the water surface and lower one is 5m below the water surface. If the value of Cv for
Q. Illustrate about Plant Type and Process? Plant layout is influenced by the type of plant (both the industry and technology utilized) and the kind of process units and associ
The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535
Explain the working of Michelson's interferometer. How circular fringes he produced with it. (a) What are antireflection films and interference filters? (b) Find the reflecti
What different of blow hole and pin hole
Q. Identification of Pressure Welds? Pressure welds shall be identified as follows: a. Generally each weld shall be stamped adjacent to the weld with the welder's identity c
cause effect remedies
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd