Relation of the angle of contact between pipe invert and bedding material to the load resisting capacity of pipe

Minimum crushing strength is a generally adopted parameter for describing the strength of rigid pipes such as concrete pipes. This value is determined in laboratory by subjecting the test concrete pipe to a line load diametrically along the pipe length whereas the pipe invert is supported on two bearers for stability reason. This test is known as three-edge bearing test and the load at failure of pipes is expressed in terms of kN per length of test pipes (known as minimum crushing strength).  

Bedding factor of a pipe is stated as failure load for the pipe laid in actual ground with bedding to the failure load under three-edge bearing test. Bedding factor is largely related to angle of contact between pipe invert and bedding material. Angle of contact between pipe invert and bedding material increases with the ratio of bending moment at invert (for the case of three-edge bearing test) to the angle under consideration.


Related Discussions:- Relation of the angle of contact between pipe invert

Diferential equations, show that Y = 4e2x - 2e-3x is a solution of initia...

show that Y = 4e2x - 2e-3x is a solution of initial-value problem (d2y)/(dx2)+ (dy)/(dx) - 6y=0 ; y(0)=6 ; y’(0)=2 . is Y = 2e2x - 4e-3x also a solution of this proble

Design volume of the aeration basin - sewer construction, Design volume of ...

Design volume of the aeration basin - sewer construction: Problem: What is the design volume of the aeration basin? Solution Assuming that 30% of the plant influe

Explain the wetted perimeter, Explain the Wetted Perimeter (P) The line...

Explain the Wetted Perimeter (P) The linear length of the interface between the fluid's cross-sectional plane edges in contact with the pipe or channel wall.

Compute interior or intersection angle, Compute Interior or Intersection An...

Compute Interior or Intersection Angle for the following circular curve:   Answer- I = 180° - 60° - 60°= 60

Determine the load which a square footing, Two load tests were performed at...

Two load tests were performed at a site-one with a 50 cm square plate and the other with a 75 cm square plate. For a settlement of 15 mm, the loads were recorded as 50 kN and 90 kN

State the term - relaxation of stress in steel, State the term - Relaxation...

State the term - Relaxation of Stress in Steel If we keep a high-tensile steel wire stretched and maintained at a constant strain, the value of the force in the wire does not

False set in pile driving, Q. False set in pile driving? For pile drivi...

Q. False set in pile driving? For pile driving in certain soils such as dense silt and weathered rock, occurrence of false set phenomenon isn't uncommon. During the driving pro

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd