prismatic compass, Civil Engineering

Assignment Help:
aim of prismatic compass

Related Discussions:- prismatic compass

Physical tests on cement, Physical Tests on Cement (a) Soundness Test: ...

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

Retardation of fresh concrete, Retardation of fresh concrete has numerous b...

Retardation of fresh concrete has numerous benefits as below: (i)  A rapid hydration process leads to loss in concrete strength since concrete will have a poorer structure with

Explain standard penetration test used in soil exploration, Explain the "St...

Explain the "Standard Penetration Test" used in soil exploration. List the information that can be obtained by the test when made in (a) clay, (b) sand. Comment on the correctio

Example of foundation depth and arrangement, Example of Foundation depth an...

Example of Foundation depth and arrangement: For example, if the maximum discharge of a river is 1000 cu m per sec, and the silt factor is 0.60, the maximum scour depth is :

Define the usage of data from hydrographs, Define the usage of Data from Hy...

Define the usage of Data from Hydrographs Flow rates and volume quantities over time. Predictions based on the runoff flow rates. The characteristics of the drainage b

Compute the safe bearing capacity of a square footing, Compute the safe bea...

Compute the safe bearing capacity of a square footing 1.5 m × 1.5 m, located at a depth of 1 m below the ground level in a soil of average density 20 kN/m 3 .   = 20°, N c = 17.7,

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Find the normal stress, Find the normal stress: Figure 1 shows the pro...

Find the normal stress: Figure 1 shows the projection of a rectangular prism ABCD, formed by adhesive bonding of two triangular prisms ABC and ACD. The state of stress in the

Water-bound macadam road construction for unpaved roads, how can I come up ...

how can I come up with the research on the water bound macadam road construction

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd