Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed will be divided into systems or sub-systems with logical break points and the Mechanical Engineer will provide the stress analyst with a preliminary information package for each piping system identified as requiring stress analysis.
Some of the critical piping systems are such that any changes in vendor information or equipment layout will result in considerable rework for the stress analyst and changes in piping layout. For other piping, preliminary analysis can be carried out without information from equipment vendors and any rework due to changes in layout or equipment details will not result in significant rework. The mechanical engineer, piping design and stress analyst will work out a schedule so that piping design, stress analysis and structural/foundation work for pipe support can proceed smoothly with minimum rework. While the sequence of work will vary from one project to another, the following general suggestions have been found useful in the past.
Q. Material Selection for Insulation? Material for 15ºC to 650ºC temp range is Calcium Silicate, Manville Thermo-12 or approved equivalent. Material for -18ºC to 230ºC temp.
Explain about the footings how it is transmit loads. Footings are generally the lowermost supporting part of the structure known as sub-structure and are the last structural e
please help me with this project
boiler water hammering
A hole of 25 mm diameter and 62.5 mm depth is to be drilled. The suggested feed is 1.25 mm/rev.and the cutting speed is 60 m/min. Assume the clearance height is 5 mm. Determine: f
Ordinate Dimensions Ordinate dimensions are not really a dimensions at all in that they did not indicate a measurement aur dimensions. Rather they annotate known co-ordinate po
What do you understand by PELE box and when it is utilized? Ans. The equipments required in PELE box are: i. HOLDER ii. TRIPOD STAND iii. BULBS iv. CROCODILE CLIP
Resulting structure of steel: Heat treatments as mentioned below are given to thin steel strips for which TTT diagram is as shown in Figure 19. What will be the resulting stru
Two position synthesis of crank rocker mechanisms
no passing rule definition
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd