Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed will be divided into systems or sub-systems with logical break points and the Mechanical Engineer will provide the stress analyst with a preliminary information package for each piping system identified as requiring stress analysis.
Some of the critical piping systems are such that any changes in vendor information or equipment layout will result in considerable rework for the stress analyst and changes in piping layout. For other piping, preliminary analysis can be carried out without information from equipment vendors and any rework due to changes in layout or equipment details will not result in significant rework. The mechanical engineer, piping design and stress analyst will work out a schedule so that piping design, stress analysis and structural/foundation work for pipe support can proceed smoothly with minimum rework. While the sequence of work will vary from one project to another, the following general suggestions have been found useful in the past.
we can use in proove of energy is a propertyof system we can use (E) instead of (dQ-dW)
1. An extraction column (sketched below with the known process data) is used to remove acid from an oil stream by contacting it with pure water. It can be assumed that the oil and
Pneumatic system is a system that uses air to power something. For example, have you seen the tube systems at bank drive-up tellers? Air is used to drive the tubes back and forth f
Friction is Desirable: A friction is much desirable to stop the body from its moving condition. If there is no friction between contact surfaces, then the body cannot be st
The Cu-Sb system contains 2 eutectics, 1 eutectoid, 1 peritectic and 1 peritectoid. Mark them all on the figure, write down the temperature and composition of each point, and ident
Q. Show Piping Material Specifications? Piping Material Specifications include the development and / or review of material specifications, and the review of data sheets, materi
A single phase series resistive-inductive heating element draws a measured current of 15A when connected to a 225V single phase 50 Hz AC supply. Tests have shown that a minimum
Determine the Excavation of soil Excavation of soil in open well foundations is done by dredging with grab buckets or similar equipment. The volume of excavated soil always e
What makes engine move?
Write down the energy balance for a vapor stream going through a throttling valve (a valve that just reduces the pressure). State your assumptions. Suppose a nonvolatile materi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd