Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed will be divided into systems or sub-systems with logical break points and the Mechanical Engineer will provide the stress analyst with a preliminary information package for each piping system identified as requiring stress analysis.
Some of the critical piping systems are such that any changes in vendor information or equipment layout will result in considerable rework for the stress analyst and changes in piping layout. For other piping, preliminary analysis can be carried out without information from equipment vendors and any rework due to changes in layout or equipment details will not result in significant rework. The mechanical engineer, piping design and stress analyst will work out a schedule so that piping design, stress analysis and structural/foundation work for pipe support can proceed smoothly with minimum rework. While the sequence of work will vary from one project to another, the following general suggestions have been found useful in the past.
project on solid work 2012 The Final Project is to design a mechanical assembly in Solidworks. The design must consist of a minimum of 60 parts, 30 of which must be unique. A uniqu
Classification Two categories of plastics are identified. Those are: thermosetting plastics and thermoplastics. Plastics generally cannot stand higher temperatures. They becom
Three basic types for microbial systems: Porous, nozzle and orifice Porous sparger Laboratory operation, usually constructed from sintered glass or metal. Disadvantages a
List and explain the five stages of change. What stage are you at in regards to your own exercise program and explain why? (50-100 words) Refer to page 4 of The Essential Guide to
Calculate the shear flow in each wall of the fuselage section below. The flange areas are 1 sq in and the web thicknesses are 0.05 in. The material has modulus E = 10 mpsi and G =
Cross Belt Drive: When shafts are rotating in the opposite direction, cross belt drive can be obtained. Figure In the diagram given to us pulley 'A' is called as
Function of heat pump: Refrigerator The primary function of heat pump is to transfer heat from the low temperature system to the high temperature system, this transfer of
Quality Improvement : CAD can improve the quality of engineering design by increasing the efficiency and effectiveness of the designers. This can be observed with excellent
Two bodies of mass 1 kg and 2 kg move towards each other in mutually perpendicular direction with velocities 3m/s and 2 m/s respectively. If the bodies stick together after collisi
Iron Powder Electrodes Iron powder is a widely used covering ingredient. It is incorporated in certain coverings to the extent of one half of the total weight. Iron Powder impart
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd