Q. Planning and Research in power system?

Energy research worldwide is assuming top priority, in particular because of economic, en - vironmental, and resource constraints. DOE (Department of Energy) was established in the United States in 1977. A major private utility sponsored energy research organization, EPRI (Electric Power Research Institute) in Palo Alto, California, has been in existence since 1972. In addition, large utility companies, such as AEP (American Electric Power), have their own research programs.

The major goals for the future are:

• New primary resources (such as nuclear fusion and solar energy) for electric bulk power generation

• Development of better means of generation (such as superconducting generators) and transmission (such as six-phase)

• Emphasis on energy conservation (better utilization of electricity with less waste)

• Electric-energy storage facilities such as pumped storage, compressed gas, storage batteries, and superconducting magnetic coils.


Related Discussions:- Planning and research in power system

Balanced score card and key performance indicators, Balanced Score Card and...

Balanced Score Card and Key Performance Indicators Every successful organization measures its performance across the subsequent parameters, for dissemination to all stakeholde

Jfet common drain amplifier, Q. JFET Common Drain Amplifier? The common...

Q. JFET Common Drain Amplifier? The common drain FET amplifier is similar to the common collector configuration of the bipolar transistor. A general common drain JFET amplifier

What are the applications of jfet, Q. What are the applications of JFET? ...

Q. What are the applications of JFET? · FET is used as a buffer in measuring instruments, receivers since it has high input impedance and low output impedance. · FET's are u

EDC, What is hall effect?

What is hall effect?

Process of spark erosion machining, Describe the basic process of Spark Ero...

Describe the basic process of Spark Erosion (Electric Discharge) machining? Discuss the advantages of EDM as compared to other nontraditional procedures with regard to : (i)

Explain amplitude-shift keying, Q. Explain Amplitude-shift keying? A ca...

Q. Explain Amplitude-shift keying? A carrier's amplitude is keyed between two levels (binary 1 and 0) in binary ASK. Figure shows the functions of a coherent ASK communication

Customer indexing scheme, Customer Indexing Scheme: Customer indexing ...

Customer Indexing Scheme: Customer indexing and asset codification system provides a platform to enable the utilities to generate verifiable and validated data of consumers an

Aerodynamic principles & aircraft design, Define the aircraft axes & degree...

Define the aircraft axes & degrees of freedom. Analyse the different maneuvers that can be done by an aircraft.

Dee, how do we construct wind turbines. procedures methods

how do we construct wind turbines. procedures methods

What is the signal classification of 8085, What is the signal classificatio...

What is the signal classification of 8085 All the signals of 8085 can be classified into 6 groups Address bus Data bus Control and status signals Power supply and f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd