Passenger Terminal Building:

Importance

In a civil airport, the passenger terminal building is the centre of all activities. It services both inbound and outward bound passengers and their baggage and provides them facilities while they are in the airport.

Requirements of Passenger Terminal Building

The requirements of various authorities and users are summarised below :

Passengers

(a)        adequate kerb space for vehicles for arriving and departing passengers, rental cars and taxis,

(b)       adequate parking for vehicles close to the terminal building,

(c)        comfortable seating arrangement, toilets, post office, bank, restaurant, book stall and telephone,

(d)       good flight information system,

(e)        adequate number of baggage X-ray equipment,

(f)        good public address system,

(g)       segregation of arriving and departing passengers,

(h)       good baggage handling system,

(i)        good signage system,

(j)         passenger escalators for climbing up or down from one level to another, and

(k)       inter-terminal transport facility.


Related Discussions:- Passenger terminal building

Doors, rolling steel door

rolling steel door

Vibrocoring in marine ground investigation, Vibrocoring in marine ground in...

Vibrocoring in marine ground investigation If only shallow marine ground geotechnical information is essential for design purpose, vibrocoring is certainly a good choice for s

Structural connection loosening - deterioration in steel, Define Structural...

Define Structural connection loosening - Deterioration in Steel? Structural connections joined together by rivets or bolts have a tendency to work loose over an extended period

Supply each tremie pipe with a single concrete truck, Question Througho...

Question Throughout concreting of diaphragm walls , three tremie pipes are used in single time. But, only one concrete truck is obtainable. How have to concreting works been a

Calculate the total cost for the project, The total equipment cost for an a...

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Water hammer, how can Simulink calculate wave speed of water hammer

how can Simulink calculate wave speed of water hammer

What is the pre-tensioned concrete, What is the Pre-tensioned concrete ...

What is the Pre-tensioned concrete In Pre-tensioned concrete tendons are kept stretched with suitable mechanisms and concrete is cast into the forms through which stretched ten

Surveying, description of instruments used transfer upper floors *plumb-bob...

description of instruments used transfer upper floors *plumb-bob method *theodolite method *theodolite and target method *optical plumbing method

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd