Mixed ground with soils and boulders, Civil Engineering

Assignment Help:

Ground settlement occurs when pipe-jacking machine enters mixed ground with soils and boulders?

The rate of cutting through soils is faster than cutting through boulders for pipe-jacking machine. When pipe-jacking machine enters a region of mixed ground with boulders andsoils, machine has the tendency to move in the direction of soft soils due to the difference of rate of advancement of pipe-jacking machine for boulders andsoils. Therefore migration of soft soils take place which contributes to ground settlement. Degree of settlement is dependent of the depth of soil cover, soil property and size of boulders.


Related Discussions:- Mixed ground with soils and boulders

Cost effective buildings, How to construct Semi Ellitical Buildings of 15fe...

How to construct Semi Ellitical Buildings of 15feet dia., in Brick Masonry.

Site plan, can I have some help with a site plan. I want it on autocad, I h...

can I have some help with a site plan. I want it on autocad, I have all the dimmension

Explain measured shovel packing, Explain Measured shovel Packing Measu...

Explain Measured shovel Packing Measured shovel Packing essentially consists of accurate measurements of track defects particularly the unevenness and voids caused in the cour

Epoxy-coated bars vs galvanized bars, Bonding performance to concrete: Epox...

Bonding performance to concrete: Epoxy-coated bars vs. galvanized bars  Based on the findings of CEB Bulletin 211 the bonding of galvanized bars to concrete is lower in early

Operation researcg, Discuss Scope and necessity of O.R in industry ?

Discuss Scope and necessity of O.R in industry ?

coursework (commercial management), Ask que1. Identify the risks involved ...

Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers. 2

How the water table may rise to the ground surface, State the size of a squ...

State the size of a square footing at the ground level to transmit a load of 900 kN in sand weighing 18 kN/m 3 and having an angle of shearing resistance of 36° (N  = 46, Nq = 43)

Road drainage and maintenance, Road Drainage and Maintenance: The life...

Road Drainage and Maintenance: The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic insp

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd