Q. Describe the Consolidation Settlement?
The resulting settlements which are time-dependent and are termed consolidation settlements. After the consolidation settlements take place, creep (or secondary consolidation) of the soil under applied stress may continue for some additional time. Soil creep is a major portion of the total settlement for many organic and peaty deposits. It appears further, the poorer the soil (soft, stratified, filled-in type), the less likelyhood for a reliable settlement estimate.
Settlement is not always a bad characteristic for the structure, provided it is UNIFORM throughout and does not reach excessive limit or permissible value. If the sefflements are unequal, i.e. if one corner settles down more than the rest of the structure, then it is a very adverse design. Unequal settlement may cause floors to cracks, plasters to crack badly.
explain re inforced brick work?
use of rapid sand filter in grey water treatment units
Q. Constriction of waterway at bridges? Constriction of waterway at bridges is effected by extending the approach banks to cover spill area or, in addition, part of active chan
how to calculate the section weight for open square tube
what is the type of slope protection that use rocks and put cements between those rocks??the concept is same as brick layer
Q. Inspection and Quality Control Certificate : A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certif
The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o
Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce
Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440. The average crew-hour cost is $15,879 for this
define unit
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd