Mine Drainage Task, Other Engineering

Assignment Help:
The purpose of this project is to design a pipeline and pumping system to dewater a mine. The production level is 500m below surface. Ore is fed through crusher chambers to the transport level which is 530m below surface. Access into and out of the mine is by 4 declines at a gradient of 1 in 8. During the production phase the following water inflow rates are anticipated: Groundwater Dry Season (8 months) 105l/s and Wet Season (4 months) 190l/s Service Water 75l/s. The purpose of the project is for students to design a suitable pipeline and pumping system to deal with the water flow in the mine and to pump it to a settling pond located on surface at a distance of 1.5km from the mine portals. Main pumping stations underground are located at the base of the conveyor decline connecting to the transport level and at 250m below surface off the main vehicle access decline. In addition students are to devise a system to drain water to the transport level pumping station. Assume g=9.81m/s2 Density of water = 1000 kg/m3

Related Discussions:- Mine Drainage Task

Cupola, The cupola is the most widely used furnace in the foundry for melti...

The cupola is the most widely used furnace in the foundry for melting ferrous and non ferrous metals and alloys. Various zones of cupola     (i)            Well or crucibl

Product applications of powder metallurgy, Q. Describe two major product ap...

Q. Describe two major product applications of powder metallurgy. Ans. Following are some typical applications of powder metallurgy.         (i) Refractory metal : P

Angle rate systems , Traditionally, seekers have been simple correlation tr...

Traditionally, seekers have been simple correlation trackers and a set of gimbals that are used to measure the angle rates of the target.          - Infrared seekers detect a

Mpmc, .What is MASM? Explain its features

.What is MASM? Explain its features

Router, how does the Ip message finally reassemble?

how does the Ip message finally reassemble?

Linear programing, Description of the Diet Problem The goal of the diet pro...

Description of the Diet Problem The goal of the diet problem is to find an ”optimal” combination of foods that will satisfy all the daily nutritional requirements of an individual.

Hysteresis, hysteresis loss least epends on

hysteresis loss least epends on

#title.welding., Does the atmospheric pressure inside of a tube aproximatel...

Does the atmospheric pressure inside of a tube aproximately a half an inch in diameter cause resistance against an end plug being flash welded to the end of it and what would be th

Help please, Judy Johnson is choosing between investing in two Treasury sec...

Judy Johnson is choosing between investing in two Treasury securities that mature in five years and have par values of $1,000. One is a Treasury note paying an annual coupon of 5.

Mine engineering, Students are to undertake a tunnel blast design for the f...

Students are to undertake a tunnel blast design for the following conditions: • Tunnel is 5.5m wide by 5.5.m high • Rock is a sandstone with a UCS of 400 MPa • Drill hole diameter

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd