Mine Drainage Task, Other Engineering

Assignment Help:
The purpose of this project is to design a pipeline and pumping system to dewater a mine. The production level is 500m below surface. Ore is fed through crusher chambers to the transport level which is 530m below surface. Access into and out of the mine is by 4 declines at a gradient of 1 in 8. During the production phase the following water inflow rates are anticipated: Groundwater Dry Season (8 months) 105l/s and Wet Season (4 months) 190l/s Service Water 75l/s. The purpose of the project is for students to design a suitable pipeline and pumping system to deal with the water flow in the mine and to pump it to a settling pond located on surface at a distance of 1.5km from the mine portals. Main pumping stations underground are located at the base of the conveyor decline connecting to the transport level and at 250m below surface off the main vehicle access decline. In addition students are to devise a system to drain water to the transport level pumping station. Assume g=9.81m/s2 Density of water = 1000 kg/m3

Related Discussions:- Mine Drainage Task

Static electricity in aircraft, Static electricity in aircraft: As ment...

Static electricity in aircraft: As mentioned earlier, the effects of static electricity are of considerable importance in the design of aircraft and aircraft equipment. An air

DIGITAL SIGNAL PROCESSING, PROBLEM BASED ON USING CHEBYSCHEV IIR FILTER USI...

PROBLEM BASED ON USING CHEBYSCHEV IIR FILTER USING BILINEAR TRANSFORMATION

Flight control - estimators for control, Estimators for control: App...

Estimators for control: Applying control by the state itself needs transducers measuring each componentof x. If instead we apply control using the estimate of state (as prov

Providing fire resistant - fire safety management, Providing fire resistant...

Providing fire resistant: If the building does not provide everyone with alternative exit routes then it may be acceptable for people to pass the fire if they are separated f

HOmework, Assume that a movie is two hours long, that the frame rate is 30 ...

Assume that a movie is two hours long, that the frame rate is 30 frames per second, and that the resolution per frame is 1080i (1920×1080 pixels per frame), and that each pixel is

Question for wator resources engineering, Compute the motor size required t...

Compute the motor size required to pump 28.3 cms through a 3,050 m long, 3.66 m diameter pipeline to an upper reservoir 610 m above the lower reservoir. Use a friction facter of 0.

Post graduation, i am doing be in mechanical engg in india. so can i do my ...

i am doing be in mechanical engg in india. so can i do my masters in geoophysic ?

What processes shape earth’s surface, Expertsmind.com brings you unique so...

Expertsmind.com brings you unique solution in physicsWhat processes shape Earth's surface? What processes shape Earth’s surface? -Impact craters: bowl-shaped cr

Water distribution, examples dead end water distribution system

examples dead end water distribution system

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!