Unreinforced concrete pavement function without mesh, Civil Engineering

Assignment Help:

Question

How can it would be able for unreinforced concrete pavement function without mesh reinforcement?


Answer

Concrete carriageway, it is usually classified into two types- reinforced and unreinforced concrete pavement. Reinforcement in reinforced carriageway is used for controlling cracking. Then one might query how unreinforced pavement can manage cracking without use of mesh reinforcement. To answer this question, one has to pay attention to features of unreinforced concrete pavement. In agreement with Highways Standard Drawing No. H1109, an approximately 3mm wide groove with a depth of about one-third to one-fourth of slab thickness is designed with a regular spacing. Grooves are designed to be very narrow for stones to fall into when cracks are open due to concrete contraction. Sectional area in which groove is located is a plane of weakness and thus this groove acts a potential crack-inducing device in that any potential cracks due to shrinkage and thermal contraction might form. As a result, cracks are formed at base of groove and thus it would not cause any unpleasant visual appearance on exposed surface of unreinforced concrete pavement.


Related Discussions:- Unreinforced concrete pavement function without mesh

Comparison of pre and post-tensioning, Comparison of pre and post-tensionin...

Comparison of pre and post-tensioning A comparison between pre-tensioned and post-tensioned concrete members can be made on the basis of the following considerations. (a) T

Point of virtual fixity of lateral loading for piles, Point of virtual fixi...

Point of virtual fixity and critical length of lateral loading for piles Some engineers can get confused about the difference between the two terms which are point of virtual

Building Technology, which IS code give details about Strength of Brick?

which IS code give details about Strength of Brick?

Plane table sureying, discuss the resection method of plane table sureying ...

discuss the resection method of plane table sureying in detail

Tests on cement, Tests on Cement: The following tests are conducted o...

Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng

Coatings at the back faces of abutments, Q. Coatings at the back faces of a...

Q. Coatings at the back faces of abutments? There are many views on the necessity of application of protective coatings (can be in the form of two coats of paint) to the back f

State the procedure of prestressing, State the procedure of prestressing ...

State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces

Fluids, FLUID substance which deforms continuously when subjected to a shea...

FLUID substance which deforms continuously when subjected to a shear stress  LIQUID no fixed shape deforms under gravity to container shape virtually incompressible = const

Cross sectional area to be excavate for roadway construction, The Table pro...

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd