Mechanical data for line designation tables, Mechanical Engineering

Assignment Help:

Line Designation Tables (LDT's) (Appendix "D") are initially generated by the Piping designers. Design conditions are inputed by the Process discipline, and the Mechanical Engineer/Specialist is responsible for addition of the Mechanical Engineering fabrication and testing sections. The Process and Piping groups are responsible for the data their groups provide, and shall indicate this by signing the LDT. The Mechanical Engineer/Specialist has overall responsibility for the preparation, coordination, signing and stamping of the LDT's


Related Discussions:- Mechanical data for line designation tables

GD & T Expert needed to drawing chenck, Dou you have someone with good GD &...

Dou you have someone with good GD & T knowledge who can help me with ceheck, markup and comment mechanical drawings in PDF file format wich I will send?

About water engines, when the water is artificially pressurized in a water ...

when the water is artificially pressurized in a water turbine, what is its power and the speed of rotation of a rotor?

Torsion, series shaft and parallel shaft

series shaft and parallel shaft

Safety and loss prevention, Q. Safety and Loss Prevention? Are there sp...

Q. Safety and Loss Prevention? Are there special venting requirements for flammables and toxic materials? Air conditioning, heating and ventilation: • are non-sparking fa

What do you mean by contractility, Q. What do you mean by Contractility? ...

Q. What do you mean by Contractility? Heart being a muscular pump the ability to eject blood depends on the ability to contract. Another factor is the resistance in the vascula

Calculate the length of plastic deformation, Calculate the length of plasti...

Calculate the length of plastic deformation: Calculate the length of plastic deformation along 45o in case the applied stress is 63.25% of yield stress in the plate of abov

Overview of project phases, Q. Overview of Project Phases? Conceptual ...

Q. Overview of Project Phases? Conceptual Engineering Phase The purpose of this phase of work is to develop the Client's proposal to a level of detail adequate to determin

Determine the acceleration of the body, Determine the acceleration of the b...

Determine the acceleration of the body: Two weights P and Q are associated by the arrangement shown in Figure. Neglecting friction and the inertia of the pulleys and cord, det

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd