Material handling equipment, Mechanical Engineering

Assignment Help:

In selection of material handling equipment itself Hageman indicates that the final consideration are:

1. Methods of Installation: Operating controls should be accessible adjustments and repairs easy to make and provision made for later changes and additions.

2. Design of the Equipment of System :It should have the required strength rigidity capacity etc.

3. Application of Power: A wide choice is available between electric gaseline steam and air and hydraulic through variable speed transmission.

4. Methods of Operation : It should be capable of operating effectively at average capacity or heavy over loads and under both normal and abnormal conditions.

5. Standardization of Equipments : this makes it possible to carry sufficient spare parts without building up an excessive spare parts inventory, and makes economically feasible some duplication of apparatus for interchange ability of units.

6. Maintenance and Repair of Equipment : Provision should be made for systematic inspection cleaning adjustment lubrication and repair of equipment.

7. Application of automatic Control Devices : There are many available to meet specific needs such as safety steps and micro levellers fo elevators limit switches for cranes selectors for gravity feed conveyors automatic filing regulators for conveyors and electronic controls for a wide variety of equipment.


Related Discussions:- Material handling equipment

Find out the acceleration of the mass centre, Find out the Acceleration of ...

Find out the Acceleration of the mass centre: A wheel of mass 200 kg and a diameter of 700 mm rolls without slipping down a plane inclined at an angle of 20 o with the horizo

Materials requirements planning, Materials requirements planning: Mate...

Materials requirements planning: Materials requirements planning (MRP) is a set of process for converting forecasted demand for a manufactured product into a requirement sched

Btec, advantages and disadvantages of kanban

advantages and disadvantages of kanban

Calculate the shear flows at the wall, The tapered, two-cell beam is subjec...

The tapered, two-cell beam is subjected to a pure torque of 50,000 in-lb counter clockwise. The length of the beam (normal to the figure) is 100 in. The flange areas are 1 sq in an

How is metal removed in metal cutting, How is metal removed in metal cuttin...

How is metal removed in metal cutting ? Explain the process by giving simple model to explain the metal removed process. What are the different conditions that could allow a con

Die design, #question calculate bending force

#question calculate bending force

Construction of lacashire boiler, Construction of Lacashire boiler: C...

Construction of Lacashire boiler: CONSTRUCTION : Consists of boiler shell which contains water and steam. Diameter can vary from 1.75 to 2.75 m and length can be 7.25 - 9 m

Graphical simulation animation of a cad system, Graphical simulation animat...

Graphical simulation animation of a CAD system can be used to inspect the tolerance and interference of matching components of a product. It will be possible to precisely define

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Welding, Why is the quality of welds produced by submerged arc welding very...

Why is the quality of welds produced by submerged arc welding very good#Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd