Main function of followers in driven h-piles, Civil Engineering

Assignment Help:

Question

What is main function of followers in driven H-piles?


Answer

A follower is an extension between pile head and hammers which transfers blow to pile in which pile head cannot be reached by hammer or is under water.For construction of driven piles, piling frame and hammer are usually erected on existing ground level but not at support of pile caps. Although, H-piles are designed to be terminated near base of pile caps. If piles are driven at ground level, certain length of H-piles is exhausted and cut at what time constructing pile caps. In this association, pile followers are used so as to save wasted section of H-piles as followers can be separate all through subsequent construction of pile caps.

 


Related Discussions:- Main function of followers in driven h-piles

Tests on limestones, Tests on Limestones Practical tests are made on li...

Tests on Limestones Practical tests are made on lime stones to decide their suitability is following:     i.       Physical tests    ii.        Heat test    iii.

Open foundation, what is savest foundation in the soft sanded earth

what is savest foundation in the soft sanded earth

Levelling, how to go about the collimation method.

how to go about the collimation method.

Steel tubular marine piles, Question Give genuine reason that why are ...

Question Give genuine reason that why are steel tubular marine piles often driven open-ended? Answer In marine structure where piles are constantly topic to major la

Define continuity equation, Define Continuity Equation Mass in fluid sy...

Define Continuity Equation Mass in fluid systems is always conserved.   Ρ 1 v 1 = ???? 2 v 2   If the fluid density is the same at both points in the flow, the continui

Uses of stones, Uses of Stones Stones are used in the following civil e...

Uses of Stones Stones are used in the following civil engineering constructions are described: (i) Stone masonry which is used for the construction of foundations, , columns

Expansion joints in basement, I have building 50 m * 53 m 3 floors without ...

I have building 50 m * 53 m 3 floors without expansion joint in basement what are opinion please ? thanks

Premix carpet - road pavements, Premix Carpet: An open graded premix ...

Premix Carpet: An open graded premix carpet, commonly called premix carpet (PC), is an open graded premixed material laid to a thickness of 20 mm and rolled, followed by a se

Survey, who to we calculate the RL at first point.

who to we calculate the RL at first point.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd