List the pre-requisites for white-box testing, Software Engineering

Assignment Help:

List the pre-requisites for white-box testing

The pre-requisites for white-box testing are same to that of black-box testing with one main difference:

- During white-box testing, the testers have access to the application logic. The tester should ask for access to detailed functional specs and needs, design documents (both high-level and detailed), and source code. The tester examines the source code and prepares functional tests to make sure that the application behaves in compliance with both the needs and the specs.

 


Related Discussions:- List the pre-requisites for white-box testing

What is software testing, What is software testing? The testing process...

What is software testing? The testing process focuses on the logical internals of the software, ensuring that all statements have been tested, and on the functional externals,

Software project planning entails what activities, Software project plannin...

Software project planning entails what activities? Software project planning entails the many activities: -  Estimation:  o Effort, , resource, cost and project duratio

What are the advantages and disadvantages of big-bang, What are the advanta...

What are the advantages and disadvantages of big-bang? Advantages: This approach is easy. Disadvantages: It is hard to debug. It is not simple to isolate errors while testin

Difference between pilot and beta testing, Difference between Pilot and Bet...

Difference between Pilot and Beta Testing. Pilot testing includes having a group of end users try the system prior to its full deployment in order to give feedback on its perfo

Determine the boundary value analysis, What is a boundary value analysis? ...

What is a boundary value analysis? A boundary value analysis is a testing procedure by which the elements at the edge of the domain are selected and tested. It is a test case d

Calculate the peak manning time, Q. Consider a project for which the manpow...

Q. Consider a project for which the manpower requirement is 200 PY and the development time is 2 years. calculate the peak manning time. Ans Software Project cost K=200 PY

What is data modelling, What is data modelling? Data modeling is the ba...

What is data modelling? Data modeling is the basic step in the examine modeling. In data modeling the data objects are examined independently of processing. The data model s

Explain iterative development model in detail, Problem 1. Explain Itera...

Problem 1. Explain Iterative Development Model in detail 2. Explain the Incremental Development Model in detail 3. What are the major technical and non-technical factors whic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd