Issue in sub-transmission and distribution systems, Electrical Engineering

Assignment Help:

Issue In Sub-Transmission and Distribution Systems

The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.

An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.

From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.


Related Discussions:- Issue in sub-transmission and distribution systems

What are procedures, What are procedures? Procedures are a group of ins...

What are procedures? Procedures are a group of instructions stored as a separate program in memory and it is known from the main program whenever needed. The type of procedure

Explain a miller sweep generator, Q. With the help of circuit diagram expla...

Q. With the help of circuit diagram explain a Miller Sweep generator Figure given below shows the circuit of a Miller integrator or a sweep circuit. Transistor Q1 acts as a swi

Visible light communication project, I need a project in visible light comm...

I need a project in visible light communication with matlab design.

Find the resistance of wire, The resistance of a wire is 60 ? at 25 o C and...

The resistance of a wire is 60 ? at 25 o C and 65? at 75 o C. Find the resistance of wire at 0 o C and value of temperature co-efficient at 0 o C. Ans: Given R 25 = 60 ? a

Assembly language, To find out the largest of ten 8 bit numbers. Method: Th...

To find out the largest of ten 8 bit numbers. Method: The numbers are stored in consecutive memory locations. The counter register is initialized with 0A and the address pointer po

Estimate the maximum number of conversions, Q. The speed of an 8-bit A/D co...

Q. The speed of an 8-bit A/D converter is limited by the counter, which has a maximum speed of 4 × 10 7 counts per second. Estimate the maximum number of A/D conversions per secon

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd