Issue In Sub-Transmission and Distribution Systems
The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.
An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.
From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.
Q. Consider an RC parallel circuit excited by (a) i(t) = 20e -2t A, and (b) i(t) = 20 A. Find the forced component of the current through the capacitor for R = 2 and C = 2F.
1,Operation of face plate starter 2;Operation of a shaded pole motor 3,3 explained demerits of a rheostat method of starting adc machines
Q. Consider the common-source JFET circuit shown in Figure with ?xed bias. Sketch the sinusoidal variations of drain current, drain voltage, and gate voltage superimposed on the di
Q. What do you mean by Load factor? The two components of electric service are demand and energy. Demand is the maximum level of real power which the electric utility must supp
An abrupt silicon (n i = 10 10 cm -3 ) p-n junction consists of a p-type region containing 10 16 cm -3 acceptors and an n-type region containing 5 x 10 16 cm -3 donors. a)
how back emf is produced in transformer?
LDAX Load Accumulator Indirect Instruction This instruction is used to copy data from memory location pointed by register pair only BC or DE to the accumulator HL pair
Q. Sketch the asymptotic Bode plots for the following loop-gain functions, and find the approximate values of gain and phase margins in each case.
Transmission parameters are more effective than the hybrid parameters for simulation of the transmission line
Q. Nonsalient-pole rotor construction? The nonsalient-pole (smooth or cylindrical) rotor construction is preferred for high-speed turbine-driven alternators (known also as turb
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd