Issue in sub-transmission and distribution systems, Electrical Engineering

Assignment Help:

Issue In Sub-Transmission and Distribution Systems

The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.

An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.

From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.


Related Discussions:- Issue in sub-transmission and distribution systems

Find the t-domain forced response in glc parallel circuit, Consider a GLC p...

Consider a GLC parallel circuit excited by i(t) = Ie st in the time domain. Assume no initial inductive current or capacitive voltage at t = 0. Draw the transformed network in the

Pnp bipolar junction transistor, PNP The other kind of BJT is the PNP ...

PNP The other kind of BJT is the PNP with the letters "P" and "N" standing for the majority charge carriers inside the dissimilar regions of the transistor. Figure:

Show how conservation of power is satisfied by the circuit, Q. Show how the...

Q. Show how the conservation of power is satisfied by the circuit of Figure.

Full wave bridge rectifier circuit , Construct a full wave bridge rectifier...

Construct a full wave bridge rectifier circuit and connect it to the transformer output. What is the Output Voltage and Frequency?

Energy stored in a switched inductor, The increase in the current is buildi...

The increase in the current is building up the magnetic field surrounding the coil. Energy is stored in that field. Consider the energy supplied by the voltage source during the

Explain the meaning of ring counters, Explain the meaning of Ring Counters?...

Explain the meaning of Ring Counters? A ring counter is fundamentally a circulating shift register in which the output of the most significant stage is fed back to the input of

#title.Electrical Machine., ) Design a suitable double –layer lap winding f...

) Design a suitable double –layer lap winding for a 6-pole dc armature with 18 slots

Discuss the operation of the jk flip-flop, Q. Figure shows the master-slave...

Q. Figure shows the master-slave JKFF. Assuming that the output changes on the falling edge of the clock pulse (i.e., when the clock pulse goes from high to low), discuss the opera

Find the voltage regulation and efficiency of the line, Q. A60-Hz, three-ph...

Q. A60-Hz, three-phase transmission line has a total per-phase series impedance of 35+j140 .Ifit delivers 40 MW at 220 kV and 0.9 power factor lagging, find: (a) The voltage, c

Daa decimal adjust accumulator instruction , DAA Decimal Adjust Accumulator...

DAA Decimal Adjust Accumulator Instruction This  instruction adjusts the contents  of the accumulator  into BDC (Binary Coded Decimal )  form  after a BCD  addition. It should

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd