Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Issue In Sub-Transmission and Distribution Systems
The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.
An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.
From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.
Simplify using k-map f(A,B,C,D)=?M(4,6,10,12,13,15) Using behavioral modeling in xilinx VHDL
give the expression
Write down about the following terms: (i) Pirani Gauge (ii) Rotameter (iii) Hot wire Anemometer (iv) Drag Force Flow Meter
HILDA ( Output) It is called hold acknowledge signals it is active high i e it goes high when microprocessor receives HOLD signal.
what are the difference between digital and Analog storage oscilloscope ?
thus secondary winding of transformer consists of neutral line or not?
Multiplexed Address/ Data Bus Pins AD 7 - AD) are used for multiplexed address data bus. This bus is bidirectional input output and serves two purpose. Initially the bus
Design a recycling MOD 19 up counter using JK FFs. In your design, include the logic circuit diagram and the timing diagram output that counts from 000002 = 010 to 100112 = 1910. C
A common-collector (CC) amplifier is also known as an emitter follower (or a voltage follower) due to the fact that the output voltage "follows" the input by being approximately eq
Q. Discuss the output waveforms for a differentiating circuit. The output waveform from a differentiating circuit depends upon the time constants and shape of the input wave.Th
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd