Issue in sub-transmission and distribution systems, Electrical Engineering

Assignment Help:

Issue In Sub-Transmission and Distribution Systems

The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.

An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.

From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.


Related Discussions:- Issue in sub-transmission and distribution systems

Nicol prism, how much and what to write it is of 30 marks

how much and what to write it is of 30 marks

What are synchronous decade counters, What are Synchronous Decade Counters?...

What are Synchronous Decade Counters? Alike to an asynchronous decade counter, the synchronous decade counter counts from 0 to 9 and then recycles to 0 again, This is done by

find the sending end voltage and current, A 3-phase transmission line is 2...

A 3-phase transmission line is 200km long. The line has a per phase series impedance of 0.25+j0.45 Φ/km and shunt admittance of j7.2ΦS/km. The line delivers 250MVA, at 0.6 lagging

Evaluate the transfer function, Since dc motors of various types are used e...

Since dc motors of various types are used extensively in control systems, it is essential for analytical purposes that we establish a mathematical model for the dc motor. Let us co

Draw the differentiator circuit, Q. Draw the differentiator circuit. Explai...

Q. Draw the differentiator circuit. Explain its principle of operation with necessary waveforms ? A circuit in which the output voltage is directly proportional to the derivati

Determine the full load voltage regulation, A 25KVA, 3 phase, wye-connected...

A 25KVA, 3 phase, wye-connected, 400v synchronous generator has a synchronous impedance of 0.05 +j1.6 ohms per phase. Determine the full load voltage regulation at (a) 0.8 power

Illustrate sources and loads, Q. Illustrate Sources and Loads? A source...

Q. Illustrate Sources and Loads? A source-load combination is represented in Figure. A node is a point at which two or more components or devices are connected together. A part

Society in engineering, Cite a specific example in which the engineer must ...

Cite a specific example in which the engineer must provide maximum efficiency for a given cost

Explain the 8259 microprocessor, Explain the 8259 microprocessor. 82...

Explain the 8259 microprocessor. 8259: The 8259A adds 8 vectored priority encoded interrupts to the microprocessor. This can be expanded to 64 interrupt requests with us

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd