Issue in sub-transmission and distribution systems, Electrical Engineering

Assignment Help:

Issue In Sub-Transmission and Distribution Systems

The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.

An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.

From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.


Related Discussions:- Issue in sub-transmission and distribution systems

Input output, Input output The parallelogram symbol  is used to repres...

Input output The parallelogram symbol  is used to represent the input output  process as shown  below.                 IN01H

Operation of a biased clipper and combination clipper, Q What is a clipper?...

Q What is a clipper? Describe the operation of a biased clipper and combination clipper. The circuit with which the waveform is shaped by removing (or clipping) a portion of th

ELECTRIC DRIVES, BLOCK DIAGRAM OF DIGITAL CONTROL OF ELECTRIC DRIVES

BLOCK DIAGRAM OF DIGITAL CONTROL OF ELECTRIC DRIVES

How many electrons all semiconductor have in last orbit, All semiconductors...

All semiconductors in their last orbit have (A)  8 electrons.  (B) 2 electrons. (C)  4 electrons. (D)  6 electrons. Ans:     All semiconductors in their

Discuss direct memory access, Discuss DMA definition. Direct memory ac...

Discuss DMA definition. Direct memory access (DMA) is a process wherein an external device takes over the control of system bus by the CPU. Direct memory access is for high-sp

Find the current and voltage drop at resistor, For the circuit in figure, f...

For the circuit in figure, find the current and voltage drop at every resistor

Power distribution, 1.  Establish importance of Distribution Planning with ...

1.  Establish importance of Distribution Planning with help of suitable example.     2.  Explain different distribution planning methods.       3.Explain the six level interv

Temperature triggering , Temperature Triggering At high temperature th...

Temperature Triggering At high temperature the leakage current  of junction J 2 increases. This leakage  current is collector  current of tr 1 and Tr 2 . So rise in temperat

Compute the worst voltage regulation, Q. The following data were obtained o...

Q. The following data were obtained on a 25- kVA, 2400:240-V, 60-Hz, single-phase distribution transformer: • Open-circuit test with meters on LV side: 240 V, 3.2 A, 165 W •

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd