Issue in sub-transmission and distribution systems, Electrical Engineering

Assignment Help:

Issue In Sub-Transmission and Distribution Systems

The major issue in Sub-transmission and Distribution systems or rather the issue confronting the power sector as an overall, is the reduction of Aggregate Technical and Commercial losses to acceptable minimum levels. Upgrading the sub-transmission and distribution system and technical improvements will decrease technical losses. Proper and adequate metering will decrease metering losses described in this section. Therefore, the large amount of commercial losses cannot be reduced through upgrading the network.

An urgent and separate programmer of action comprising legislative changes, enforcement of punitive measures, strict vigilance, enhanced accountability at the field level of utility, etc. is necessary to be implemented to decrease commercial losses. The major source of revenue of utilities is from sale of energy to consumers that need prompt and correct billing and realization. This is particularly significant since, in the power sector, consumers pay after availing the service. Except from energy losses, deficiencies in proper billing and revenue collection for the energy used seriously affect the financial health of utilities. It is all along recognized in which the performance in this segment is much below the desired level and the situation is frequent aggravated through political interference.

From the discussion so far, we might conclude in which the revenue raising segment of the utilities suffers from primary deficiencies in terms of high energy losses and poor billing, revenue collection and financial management. From the consumer's perspective, power supply is characterized through poor voltage and frequent interruptions in supply. The Distribution Loss Reduction and Efficiency Improvement strategy for improvement should, therefore, be aimed at rectifying these deficiencies to ensure in which the ST&D systems operate at optimum levels of technical, commercial and financial efficiency.


Related Discussions:- Issue in sub-transmission and distribution systems

Draw a schematic diagram of transformer connections, Q. Three single-phase,...

Q. Three single-phase, 10-kVA, 2400/120-V, 60- Hz transformers are connected to form a three- phase, 4160/208-V transformer bank. Each of the single-phase transformers has an equiv

Explain about stored program control, Q. Explain about Stored Program Contr...

Q. Explain about Stored Program Control? Stored Program Control:   In centralized control, all control equipment is replaced by a single processor which should be quite powerf

Pn-junction under bias, Q. pn-Junction under Bias? Let an external sour...

Q. pn-Junction under Bias? Let an external source be connected between the p- and n-regions, as shown in Figure (a). (b) shows the circuit representation of the pn-junction or

How can a jfet be used as a constant current source, Q. How can a JFET be u...

Q. How can a JFET be used as a constant current source? Explain from the drain characteristics. As the VDS voltage is increased from 0 to a few volts, the current will increase

Digital circuits, Digital circuits In analog  circuits,  we think  som...

Digital circuits In analog  circuits,  we think  something about  voltages on terminals ranging over natural values.  This provides us the freedom to make an enormous variety

Set up a table for a 4-to-10 line excess-3 decoding, Q. (a) Excess-3 cod...

Q. (a) Excess-3 code is a 4-bit binary code for the 10 decimal digits and is found useful in digital computer arithmetic. Each combination is found by adding 3 to the decimal nu

Digital versions of band-pass filter, A case study is required for developm...

A case study is required for development of different digital versions of band-pass filter corresponding to its analogue prototype described by the following normalised transfer fu

Factors of contributing to losses in service cables, Factors of Contributin...

Factors of Contributing to Losses in Service Cables 1. Tapping of underground service cables: The service cables must be visible so that tapping of cables can be detected. U

Pass band of the resulting bandpass filter, A bandpass filter design can be...

A bandpass filter design can be accomplished through the cascade connection shown in Figure, where the frequencies between the two cutoffs fall in the passband of both filters and

Equivalent circuit of a polyphase induction machine, Equivalent Circuit of ...

Equivalent Circuit of a Polyphase Induction Machine The inductionmachinemay be regarded as a generalized transformer inwhich energy is converted and electric power is transferr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd