I.S. CODES ON EARTHQUAKE RESISTANT BUILDING DESIGN

Bureau of Indian Standard has divided the country into five zones depending upon the severity of earthquake after observing Indian earthquakes for several years. IS 1893-1984 shows the various zones. Following IS codes will be of great significance for the design engineers:

IS 1893-2002: Criteria for Earthquake Resistant Design of Structures (5th revision).

IS 4928-1993: Code of practice for Earthquake Resistant Design & Construction of Buildings. (2nd revision)

IS 13827-1992: Guidelines for Improving Earthquake Resistance of Low Strength Masonry Building

IS: 13920-1997: for Ductile Detailing of Reinforced Concrete Structures Code of practice Subjected to Seismic Forces.

IS: 13935-1993: Guidelines for Repair and Seismic Strengthening of Buildings.


Related Discussions:- I.s. codes on earthquake resistant building design

What is rail lubrication, Q. What is Rail Lubrication? Rail Lubrication...

Q. What is Rail Lubrication? Rail Lubrication is done on sharp curves where lateral wear is considerable. The function of Rail Lubrication is to lubricate or oil the running fa

List the factor that affect the permeability of a given soil, List the fact...

List the factors that affect the permeability of a given soil. Determine the precautions that should be taken so that satisfactory permeability data may be obtained. Explaining

Define the design of piers and abutments erected in water, Define the Desig...

Define the Design of Piers and Abutments Erected in Water? All piers and abutments erected in water are generally designed to be protected from scour or erosion.  However, both

Define overloading - deterioration in steel, Define Overloading - Deteriora...

Define Overloading - Deterioration in Steel? Steel structural elements are sensitive to impact damage from moving vessels and other types of accidental overloading. Impact or c

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Construction material, 4. Calculate the loose volume of material needed to ...

4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench

Concrete technology, what is the actual quantity of water to be mixed in va...

what is the actual quantity of water to be mixed in various grade of concrete and also the size of gravel to be mixed with in RCC work. Also I want to know the difference between a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd