IRC class 70R, Civil Engineering

Assignment Help:
What will be the structural weight per meter for IRC class 70r bridge

Related Discussions:- IRC class 70R

Time to remove formwork to cater for early thermal movement, Q. Time to rem...

Q. Time to remove formwork to cater for early thermal movement? Let's take a circular column as an illustration to explain effect of internal restraint to thick sections.  W

What is a pressure bulb, What are the basic assumptions in Boussinesq's the...

What are the basic assumptions in Boussinesq's theory of stress distribution in soils? Illustrate the vertical stress distribution on a horizontal plane at a given depth and also t

Landing systems, Landing Systems: There are two basic types of landin...

Landing Systems: There are two basic types of landing, viz : (a) visual landing, when the weather conditions are favourable, and (b) instrumented landing, when the weat

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Non uniform flow in open channel, #ques5. A rectangular channel is 3 m in w...

#ques5. A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when

Soil plug in marine piling system of steel tubular pile, Soil plug in marin...

Soil plug in marine piling system of steel tubular pile with reinforced concrete infill At the time of initial driving process, open-ended steel piles are driven through the s

Borrow pits - embankment construction, Borrow Pits Borrow pits are th...

Borrow Pits Borrow pits are the locations from where the embankment soil is obtained. The following guidelines govern the location of borrow pits : (a) They should be pref

Shallow bedrock condition adverse for open berth piers, Question What i...

Question What is the reason that shallow bedrock condition adverse for open berth piers? Answer Most severe load on piers generally is horizontal load due to berthing

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Write Your Message!

Captcha
Free Assignment Quote