Fixed and pinned connection between piles and pile caps, Civil Engineering

Assignment Help:

Q. Fixed vs pinned connection between piles and pile caps?

The type of connection amid piles and pile caps affects the load carrying capacity of pile groups. Fixity of pile head into pile cap, in place of pinning into pile cap, improves higher lateral stiffness of the pile groups. For example, for same deflections, a cap with fixed connected piles can withstand far more loads than that of pinned connected piles. To satisfy criteria of fixed connection, minimum embedded length of piles into pile caps must be at least two times the diameter of piles. 

Furthermore the fixed connection of piles at pile caps allows significant bending moment to be transmitted through the connections when compared with pinned connections.


Related Discussions:- Fixed and pinned connection between piles and pile caps

Write important factors that affect permeability of a soil, Determine the i...

Determine the important factors that affect the permeability of a soil. A permeameter of 8.2 cm diameter having a sample of soil of length 35 cm. It can be used either for const

Fundamental purpose of surveying, give a brief definition of surveying and ...

give a brief definition of surveying and describe its fundamental purposes

Rmc, about rmc and what are the safety measures taken and which licences ar...

about rmc and what are the safety measures taken and which licences are required

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Determine the loss in post-tensioned members, Determine the Loss in post-te...

Determine the Loss in post-tensioned members This loss occurs only in post-tensioned members. There always exists a certain amount of friction in the jacking and anchoring syst

Recognize the losses of prestress, Recognize the losses of prestress Re...

Recognize the losses of prestress Recognising the losses of prestress which take place after the prestressing OF concrete structural elements, it is to be appreciated that pres

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

#support reactions, calculate the support reaction as shown in figure;

calculate the support reaction as shown in figure;

Calculate the total area (acre) for lot, Calculate the Total Area (acre) fo...

Calculate the Total Area (acre) for Lot A 30-ft wide parabolic shaped stream divides the property as shown.  The total area (acre) for Lot 6 is most nearly: Solution:

Determine the probable period of time, A clay stratum is 4.5 m thick and re...

A clay stratum is 4.5 m thick and rests on a rock surface. The coefficient of consolidation of a sample of this clay was found to be 4.5 × 10-8 m 2 /s in the laboratory. Verify pro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd