Inspection - planning, accuracy and necessity, Supply Chain Management

Assignment Help:

Inspection - Planning, Accuracy and Necessity

The inspection and the test plans should identify the product which is to be tested and inspected. It should clearly define the requirements and criteria for acceptance. The inspection procedures in every stage are to be defined. The parameters used for conformance must include those which are to be verified by the manufacturing procedures. The inspection and testing plans must identify the product which has to be inspected and tested.

  • The following are the activities of inspection planning:
  • Designating the "stages" at which inspection should occur.
  • Defining the requirements and acceptance criteria that are to be used.
  • Defining the parameters which are to be tested at every single stage.

Performing a verification of the various parameters, and this should include the elements which are to be varied by the manufacturing process.

  • Describing the aids ways of doing inspection and test equipment, this is to be used.
  • Encompassing the results of the inspections and tests that need to be recorded.
  • Providing the stations with the means for knowing what to do plus facilities for doing it.
  • In case of simple routine characteristics, the planning is often done by the inspector. The planning in case of complex products made in large multi departmental organisations is usually done by specialists such as quality engineers.
  • Receiving inspection is often surrounded with the responsibility of production operators. In some cases, the inspector goes to the work by patrolling a large area and performing inspections at number of locations, including the shipping area, at the supplier's plant or on the customer's premises.
  • If failed to provide adequate documented procedures for inspection, the inspection procedure will not be reliable enough to identify the mistakes and will not be able to identify the non conforming product. If the recording of the data related to inspection is failed, recordings of the individual inspectors must be relied on.

Related Discussions:- Inspection - planning, accuracy and necessity

Ace, supply chain of milk

supply chain of milk

Definition of an identification problem, Identification problems 1.  W...

Identification problems 1.  What is the definition of an identification problem (in the context we have discussed in EC337)?   2.  Two general empirical patterns are that (1)

Linear programming, Hello i need some help with a homework for next Monday ...

Hello i need some help with a homework for next Monday regarding linear programming.

Challenge question, what is the potential negative or downside to the long-...

what is the potential negative or downside to the long-term Starbucks-OHL collaboration? identify what you consider to be three major potential problems in such long term relations

Investigate the relationship with the foreign suppliers, Does the company's...

Does the company's purchasing activities influenced by national and transnational organizations Briefly explain. Investigate the relationship with the foreign suppliers, Compar

#title.project risk and procurement management., How do i evaluate the use ...

How do i evaluate the use of a complex models for this title?

Diving, supply chain of diving by Adrenalin Snorkel Dive

supply chain of diving by Adrenalin Snorkel Dive

Show the cpfr model and its benefits, Question 1: Describe in detail th...

Question 1: Describe in detail the management processes in the SCOR model. Diagram and Definition of each process Ambit, Main aspects and functions of SCOR model

Network design, can you help with network design questions?

can you help with network design questions?

Supply chain management, Seamless Integration: Integration of new product ...

Seamless Integration: Integration of new product introductions or changes to existing products fully into the enterprise system also known as engineering change management is cruc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd