Q. Heat Exchangers - air-conditioning guidelines?

Location, size and capacity clearly indicated. Control valves indicated. Space for tube removal, keep space clear of pipes, valves, etc., flanges or unions to clear the removal space. Pump loop provided.

Check mounting height for proper drainage of condensate. Where not possible, provide condensate transfer unit. Check adequate support with structural. Schedule in specification complete.


Related Discussions:- Heat exchangers - air-conditioning guidelines

What is plain concrete footing, What is Plain Concrete Footing? Plain C...

What is Plain Concrete Footing? Plain Concrete Footing: Footings carrying relatively light loads are constructed with plain concrete. You have already seen a plain concrete

Polythionic Acid Stress Corrosion Cracking, In Naphtha Hydrotreating Unit, ...

In Naphtha Hydrotreating Unit, does feed/effluent heat exchangers require passivation to avoid polythionic acid stress corrosion cracking.

External pressure design of unfired pressure vessels, Q. External Pressure ...

Q. External Pressure Design of unfired pressure vessels? Determine requirements for external pressure based on the expected operation of the vessel, and add a suitable operatin

Classification of steam engine , CLASSIFIC A TIO N: (1 )  In acco...

CLASSIFIC A TIO N: (1 )  In accordance to Cylinder Axis: Engine can be vertical or horizontal. (2 )  In accordance to action of steam: Can be single acting or doub

If o ring found to be leaking-oil seal is found be leak, If "o" ring is fou...

If "o" ring is found to be leaking or oil seal is found to be leaking check as mentioned: If "O" ring found to be leaking change "O" rings. If oil seal found to be leaking check o

Determine the increase in pressure in vessel, Determine the increase in pre...

Determine the increase in pressure in vessel: A thin spherical vessel of diameter 750 mm & wall thickness 8 mm is filled through water at atmospheric pressure. Determine the i

Fifth service and sixth service-mandatory checks , Fifth Service and Sixth ...

Fifth Service and Sixth Service Following extra mandatory checks are required during the fifth service of a 125 cc motorcycle : Inspect engine oil and top up as re

Determine the break power of the engine, If a Laboratory experiment, the fo...

If a Laboratory experiment, the following data were recorded with rope Break dynamometer : Diameter of fly-wheel = 1.2 m Diameter of the rope = 12.5 mm Speed = 200 r.p.m.

Painting of structural components of skid, Q. Painting of structural compon...

Q. Painting of structural components of skid? Sandblasting and priming shall be carried out prior to assembly, and shall include all bolt holes, flange faces, etc. Flange gaske

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd