Q. Free- fall concrete placement in bored piles?
Based on the research by STS Consultants Ltd it was found that concrete placed by free falling below 120 feet will not suffer from the problem of segregation and strength of concrete won't be detrimentally impaired provided that piles' bore and base are dry and free of debris. Furthermore it's assumed in the past that during free falling of fresh concrete into the pile bores the hitting of falling concrete in the reinforcement cage causes segregation. Though in accordance with experimental results of STS Consultants Ltd, striking of reinforcement cage by fresh concrete doesn't have significant effect on the strength of concrete.
Additionally for long bored piles, it's impractical to conduct vibration to concrete. For concrete placed by free falling method, impact action arising from free falling is presumed to induce adequate vibration. Alternatively concrete placed by tremie method appears to be lack of vibration and this can affect the integrity and strength of concrete. The research results showed that strength of vibrated concrete was slightly higher than unvibrated concrete. Vibration proved to have added benefit to concrete strength however not essential to achieve the design pile strength.
A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo
Embankment Construction: Selection of Soil Soil is the material used for embankment construction, though other materials like rock and fly-ash are also used in specia
methods of damp proofing
Q. Mosaic and P V C Tiles? The water sink at water points may be provided with mosaic lining at other than important station. Mosaic tiles also may be provided in flooring of
assignment on role of civil engineer
what classes do you have to take and what are some school options?
can you please provide with an example for mobilisation and demobilisation plan, induction and deployment schedule, broad execution schedule in excel,quantity schedule for major qu
Radial flow pumps for small flows and high heads In radial flow pumps, a diffuser/volute is generally designed at it outlet to convert the kinetic energy obtained during the pu
Types of beams
Explain Information Processing and Perception - Driver Performance The time required to respond successfully to any driving situation, such as an emergency, involves four stage
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd