Find speed for two hours with hss tools, Mechanical Engineering

Assignment Help:

Find speed for two hours with HSS tools

Find speed for two hours tool life for dry machining of free cutting mild steel with HSS tool.

Solution

From Table 3, a value of C = 74 m/min is chosen while for HSS tool a mean value of n = 0.125 has been assumed.

V tn = C

V = C /t n

=  74 /1200.125

= 74 /1.82

= 40.67

= 40.67 metres/minute

Table 3: Constant C for Taylor's Equation

990_Tool Life Equation 1.png


Related Discussions:- Find speed for two hours with hss tools

High growth for automobiles industry growth , High growth has been observe...

High growth has been observed since 2001-02 in automobile production. Annual growth was 16.0 percent in April-December, 2004; the growth rate in 2003-04 was 15.1 percent (Table 1.

Welder performance qualifications, WELDER PERFORMANCE QUALIFICATIONS ...

WELDER PERFORMANCE QUALIFICATIONS Requirement of Welder Qualification In performance qualification, the basic attempt is to establish the ability of the welder to dep

Explain the working and construction of universal joint, (a) Describe clear...

(a) Describe clearly the constructional details and operation of various rear axle drives with the engine placed at the front. Illustrate your answer with simple and neat sketch.

Austempering, Austempering: The component to be hardened is initialy ...

Austempering: The component to be hardened is initialy austenised and after that quenched into a lead or salt bath held at just over the martensite transformation temperature

Calculate pressure on each side of spherical ball , Calculate pressure on e...

Calculate pressure on each side of spherical ball : Heavy spherical ball of weight W rests in V shaped trough whose sides are inclined at the angles and to the horizontal

Determine strap beam with suitable demonstration, Determine strap beam with...

Determine strap beam with suitable demonstration. Here observe that R e becomes greater than P e by a magnitude of V while R i becomes less than P i by a magnitude equal to

Planning a retail interior space, Question 1: A good display of the mer...

Question 1: A good display of the merchandise is the result of planning, cooperation and coordinating. A good schedule of work is important for a good design with the use of me

Thermodynamics, define the first and second law of thermodynamics.

define the first and second law of thermodynamics.

Simple rules-priority rules-conventional priority rules, Simple Rules F...

Simple Rules FIFO (first in first out) PN j = t aj SPT (shortest processing time) PN j = o j ODD (earliest operation due dates) PN j = t dj EDD (earliest job due

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd