Find speed for two hours tool life for dry machining of free cutting mild steel with HSS tool.

Solution

From Table 3, a value of C = 74 m/min is chosen while for HSS tool a mean value of n = 0.125 has been assumed.

V tn = C

V = C /t n

=  74 /1200.125

= 74 /1.82

= 40.67

= 40.67 metres/minute

Table 3: Constant C for Taylor's Equation

990_Tool Life Equation 1.png


Related Discussions:- Find speed for two hours with hss tools

High resistance or low current in primary coil circuit, If High Resistance ...

If High Resistance or Low Current in Primary Coil Circuit Causes of Problem Remedy   Disconnected or loose wires

Define the binary vapour cycle, Write brief notes on the following : (a)...

Write brief notes on the following : (a) Draught System (b) Binary Vapour Cycle (c) Cooling Towers (d) Governing of steam turbines

Process of a pneumatic proportional controller, Explain the process of a Pn...

Explain the process of a Pneumatic Proportional Controller and get its transfer function. What modification is needed to make it function as a proportional plus derivative controll

Graphical simulation animation of a cad system, Graphical simulation animat...

Graphical simulation animation of a CAD system can be used to inspect the tolerance and interference of matching components of a product. It will be possible to precisely define

Block''s acceleration, A block whose weight is 36.0 N rests on a horizontal...

A block whose weight is 36.0 N rests on a horizontal table. A horizontal force of 35 N is applied to the block. The coefficients of static & kinetic friction are 0.650 and 0.420, r

Combustion , How do i calculate the flame radius and flame speed if unstret...

How do i calculate the flame radius and flame speed if unstretched flame speed=2.8m/sec and markstein length=5 mm. ?

Computer control system in flexible manufacturing system, Computers control...

Computers control system in flexible manufacturing system

Forecasting system outputs, Forecasting System Outputs: In a company, ...

Forecasting System Outputs: In a company, inventory level is reviewed biweekly. If the parts used in an assembly have the lead time of one and a half week, what period should

Method of joint, Method of joint: How you can find out force in the m...

Method of joint: How you can find out force in the member of truss by using method of joint? Sol.: In this, after determining the reactions at supports, the equilibrium

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd