Throw-away prototyping

Objective:

  • The principal objective of this model is to validate or to derive the system requirements.
  • It is developed to reduce requirement risks.

Advantages

  • Requirement risks are very less.

Problems

  • It can be undocumented.
  • Changes made during the software development proceed may degrade the system

structure.
• Sometimes organizational quality standard may not be strictly applied. 

 


Related Discussions:- Explain throw-away prototyping

What are the umbrella activities of a software process, What are the umbrel...

What are the umbrella activities of a software process? Software project tracking and control. Risk management. Formal Technical Reviews. Software Quality Assurance.

Evaluate the total costs for johns project, Question: (a) Show two mai...

Question: (a) Show two main approaches to identify risk in a project. (b) John finds that IOE recovers some overheads as oncosts on direct staff costs although others are

What problems arise if two modules have high coupling, Q. What problems ari...

Q. What problems arise if two modules have high coupling? Ans: Coupling signifies the interconnection of different modules with each other or we can say it tells about the in

Functional testing and structural test, Differentiate between functional te...

Differentiate between functional testing and structural testing. Functional testing also known as behavioural testing or  Black box testing. In this methods, tester design te

What is sci, What is SCI? Software Configuration Item is in order that ...

What is SCI? Software Configuration Item is in order that is carried as part of the software engineering process.

What are the fundamental activities of a software process, What are the fun...

What are the fundamental activities of a software process? Specification Validation Design and implementation Evolution

How to build the structure chart, Q. How to build the Structure Chart? ...

Q. How to build the Structure Chart? Building the Structure Chart Processes in the DFD are liable to represent one module on the structure chart Efferent processes

What are the elements of computer based systems, What are the elements of C...

What are the elements of Computer based Systems? Software: Data structures, Computer programs, & related document Hardware: Electronic devices, inter connectivity devices, E

Define the optimising level of maturity model, Level 5 (Optimising) O...

Level 5 (Optimising) Organisation satisfies all the requirements of level-4. This is final level. Organisation at this maturity level is considered almost perfect. At this st

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd