Explain the unit hydrograph method, Civil Engineering

Assignment Help:

Q.- Explain the Unit hydrograph Method for estimation of peak flood discharge in a river.

Ans.-

Unit hydrograph Method

A hydrograph is a representation of hydraulic characteristic of river discharge . A point on the hydrograph shows the available discharge at that time . The area under the hydrograph came between any two intervals of time say t1 to t2 shows the volume of water that has passed the measuring point in time t1 to t2.

A concept of unit hydrograph is based on the fact that for a given point in a given stream of a basin the storm of different intensity but of the same unit duration produces hydrograph of surface run off of equal length of time and of the similar shape. The ordinates are proportional to the magnitude of rain fall with the assumption that the rain fall is distributed uniformly over the entire area.

The unit hydrograph is thus defined as the hydrograph which is produced by a rainfall of given duration uniformly distributed over the catchment and which produces a direct run off volume of a unit depth of 1 cm over the entire catchment area.

Hydrograph method consists of constructing a unit hydrograph or distribution graph for the catchment and then by use of given rainfall data, the hydro graph runoff is calculated.


Related Discussions:- Explain the unit hydrograph method

Can you explain curved heads, Q. Can you explain Curved heads ? In case...

Q. Can you explain Curved heads ? In case of rivers carrying high discharges of the order of 28300 m 3 Is and above, Gale's recommendations are more conservative than Spring's

Open chanel flow, A rectangular channel is 3 m in width and draws water fro...

A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake

Estimating movement for movement joints, Question Should reversible moi...

Question Should reversible moisture movement be taken into account in estimating movement for movement joints ? Answer Size of concrete is affected by changes in dist

Consolidation settlement, The integration of strain over the depth is settl...

The integration of strain over the depth is settlement. The method of producing the settlement is non-recoverable when the intensity of stress is removed. Hence, a permanent reduc

Timber, seasoning of timber

seasoning of timber

What are the parasitic forces for prestressing, Q. What are the Parasitic f...

Q. What are the Parasitic forces for prestressing? In statically determinate structures, prestressing forces will cause the concrete structures to end upwards. Therefore precam

Define construction damage - underwater inspection of bridge, Define Constr...

Define Construction damage - underwater inspection of bridge? Construction damage can result from improper procedures during the construction phase.  Some examples are: -  P

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd