Q.- Explain the Unit hydrograph Method for estimation of peak flood discharge in a river.
Ans.-
Unit hydrograph Method
A hydrograph is a representation of hydraulic characteristic of river discharge . A point on the hydrograph shows the available discharge at that time . The area under the hydrograph came between any two intervals of time say t1 to t2 shows the volume of water that has passed the measuring point in time t1 to t2.
A concept of unit hydrograph is based on the fact that for a given point in a given stream of a basin the storm of different intensity but of the same unit duration produces hydrograph of surface run off of equal length of time and of the similar shape. The ordinates are proportional to the magnitude of rain fall with the assumption that the rain fall is distributed uniformly over the entire area.
The unit hydrograph is thus defined as the hydrograph which is produced by a rainfall of given duration uniformly distributed over the catchment and which produces a direct run off volume of a unit depth of 1 cm over the entire catchment area.
Hydrograph method consists of constructing a unit hydrograph or distribution graph for the catchment and then by use of given rainfall data, the hydro graph runoff is calculated.
Question In case of for unreinforced concrete carriageway, what will succession of closing and opening of expansion joints and contraction joints? Answer Take a case t
explain the principle of working from whole to part, as used in surveying
Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel
We can measure concrete by Cubic feet, Cubic yards, Cubic Meter
Question What is importance of critical steel ratio in scheming thermal reinforcement ? Answer Execution of critical steel ratio resources that in construction joints,
fabrication methods of ironmongery
Define the Equations for a Contracted Rectangular Weir If the rectangular weir is a contracted weir and the flow is restricted from passing freely through the weir opening, a r
effects of aggregates used in concrete
Design of one way slab, two way slab, circular slab, hollow slab step by step as ACI code 318-08, tnx
principles of levelling
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd