Explain the design of waterway, Civil Engineering

Assignment Help:

Q. Explain the Design of waterway?

When the river flows between high banks and the whole width is actively functioning during high floods, the bridge waterway should practically be equal to the spread between stable banks at the design flood level. This practice may be followed even if such a river slightly overtops the banks during extraordinary floods. These conditions may normally be met with in incised rivers and in upland reaches in river gorges.

If in the above type of rivers, depth of spill is appreciable, waterway should be suitably increased beyond bank to bank width in order to carry spill discharge without causing afflux beyond permissible limit.


Related Discussions:- Explain the design of waterway

Engineering mechanics, Characteristics of couple #Minimum 150 words accepte...

Characteristics of couple #Minimum 150 words accepted#

What are the causes of settlement, Q. What are the causes of settlement? ...

Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab

Levelling, Permanent adjustment and temporary adjustment

Permanent adjustment and temporary adjustment

Ironmongery, fabrication methods of ironmongery

fabrication methods of ironmongery

Mini projcts in diaster management.., any new innovative metods to protct b...

any new innovative metods to protct building from disater

Loss of camber in steel girders, Steel triangulated (open web) girders are ...

Steel triangulated (open web) girders are provided with camber to compensate for deflection under load. Out of the total design camber, the part corresponding to dead load is calle

Explain types of bearings, Q. Explain types of bearings? The bearing tr...

Q. Explain types of bearings? The bearing transfers the forces coming from the superstructure to the substructure. It also allows for necessary movements in the superstructure

Determine the cubic yard in the ground, An earthwork contractor encountered...

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor

What is the group capacity, State the group efficiency of a rectangular gro...

State the group efficiency of a rectangular group of piles with 4 rows, 3 piles per row, the uniform pile spacing being 3 times the pile diameter. If the individual pile capacity i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd