What is the pre-tensioned concrete, Civil Engineering

Assignment Help:

What is the Pre-tensioned concrete

In Pre-tensioned concrete tendons are kept stretched with suitable mechanisms and concrete is cast into the forms through which stretched tendons pass, as shown in Figure. At the start, the prestressing force is not transferred into the concrete as tendons are kept in a stretched form using jacks and abutments from both the sides. When concrete gains sufficient strength (and hence has sufficient bond strength with tendons), stretched tendons are cut from outside. The stretched length of tendons falling inside concrete remains in a stretched state, due to its bond with concrete, and the prestressing force of tendons (which is of a tensile nature) is passed into concrete in the form of a compressive force. Depending on its magnitude, this compressive force reduces or eliminates the tensile stresses, produced due to external loads, in concrete.

178_Pre-tensioned concrete.png


Related Discussions:- What is the pre-tensioned concrete

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Determine the total stopping sight distance in feet, Determine the total St...

Determine the total Stopping Sight Distance in feet A motorist is travelling down a 6% grade at 65 mph and needs to stop because of a crash scene.  Assuming a 2.0 sec PRT and 1

Bricks properties, what is the application of silica,aluminaand magnesium i...

what is the application of silica,aluminaand magnesium in bricks?

Surveying, What is reciprocal ranging

What is reciprocal ranging

What is the unit weight of water, In a pipette analysis, 0.5 N of dry soil ...

In a pipette analysis, 0.5 N of dry soil (fine fraction) of specific gravity 2.72 were mixed in water to form half a litre of uniform suspension. A pipette of 10 ml capacity was

Estimate Bridge Pier Concrete, Takeoff the 3 elements for the following bri...

Takeoff the 3 elements for the following bridge pier components: 1. Pier Footing, 2. Pier Column, 3. Pier Cap (Top). • Misc Items to include Shear Key. • Misc Items to exclude Reba

Number of segments for segmental linings in tunnelling, Q. Number of segmen...

Q. Number of segments for segmental linings in tunnelling? For the construction of tunnels by segmental linings, choice of the number of segments affects the durability and cos

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd