Movement accommodation factor for joint sealant, Civil Engineering

Assignment Help:

Movement accommodation factor is normally specified by manufacturers of joint sealants for designers to design dimension of joints. It is stated as the total movement that a joint sealant can tolerate and is typically expressed as a percentage of the minimumdesign joint width. Failure to fulfil this requirement results in overstressing the joint sealants. 

For example if the expected movement to be accommodated by a certain movement joint is 4mm, the minimum design joint width can be computed as 4÷30% = 13.3mm when the movement accommodation factor is 30%. If the calculated joint width is too large, designers can either select another brand of joint sealants with higher movement accommodation factor or to redesign arrangement and locations of joints.


Related Discussions:- Movement accommodation factor for joint sealant

Explain hardness - water softening, Explain Hardness - Water Softening ...

Explain Hardness - Water Softening 1) Hardness is used to characterize a water that does not lather well, causes a scum in the bath tub and leaves hard, white, crusty deposits

Loss of prestress due to elastic shortening, Loss of prestress due to elast...

Loss of prestress due to elastic shortening At the transfer of prestress, tensile stresses of tendons are transferred to concretc in the form of compressive stresses. Due to t

Softening test point, the importance of softening point of a bitumen materi...

the importance of softening point of a bitumen material in the design of a pavement

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Gts bench mark, Gts bench mark in thane district maharashtra

Gts bench mark in thane district maharashtra

Explain the design criteria for sedimentation basin, Explain the Design Cri...

Explain the Design Criteria Sedimentation basin Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area) Detention time t or ? = V/Q (Volume /Flow rate)

Levelling, what is the types of levelling

what is the types of levelling

Assignment, information of cement types

information of cement types

Define the pre-tensioned concrete construction, Define the pre-tensioned co...

Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd