Explain template jig, Civil Engineering

Assignment Help:

Explain Template Jig?

1) Template jig is the simplest type of jig, employed for accuracy than speed.

2) This jig fits over, on, or, into the work and is not generally clamped.

3) This type jig is appropriate if only a few parts are to be made.

 

717_Explain Template Jig.png

 


Related Discussions:- Explain template jig

Explain the components of a rebound hammer, Explain the Components of a reb...

Explain the Components of a rebound Hammer? Several components of a rebound hammer are displayed in below Figure. 1. Concrete surface; 2. Impact spring; 3. Rider on gui

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Explain different types of texture and structure of soils, (a) Relate dissi...

(a) Relate dissimilar formations of soils to the geological aspects. (b) Explain different types of texture and structure of soils. (c) Bring out the typical characteristics

Find the youngs modulus of the rod, Find the Youngs modulus of the rod: ...

Find the Youngs modulus of the rod: A composite rod is made by joining a copper rod end to end with a second rod of different material but of same cross-section. At 25oC, the

Binders - cement, Binders : Cement: Cement as a Binder Cement...

Binders : Cement: Cement as a Binder Cement is one of the main ingredients of concrete. When cement sets (with the addition of water), it forms a paste and binds the

Heat transfer, Three mechanisms: 1) Conduction - occurs in solids and st...

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

Retaining wall, whether the wall has adequate sliding resistance

whether the wall has adequate sliding resistance

Base isolation, why base isolation is not good for tall building

why base isolation is not good for tall building

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd