Explain Situations that warrant a damage inspection?
- Floods - bridges located in streams, rivers and other waterways with known or suspected scour potential.
- Build-up of debris at piers or abutments - this material build up effectively widens the unit and may cause scouring currents or increase the depth of scour.
- Evidence of deterioration or movement - many underwater deficiencies only become apparent above water when the distress extends above the water line or is manifested by lateral movement or settlement.
- Significant earthquake - bridges also need to be inspected after an earthquake where structural damage is expected.
what are the applications of statics in engineering
Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div
what is meant by white topping cement
Question Now, mainly flap valves are ended of HDPE. What is the major compensation of using HDPE as compared with cast iron? Answer (i) It has no response with sewage a
Q. Necessity of air voids in bituminous pavement? If the presence of air voids is too high, it results in an increase of permeability of bituminous pavement. This enables the f
lime saturation factor meaning with simple english
a. We put a lot of time and effort into cultivating our activated sludge microbial community. So why do we waste sludge out of it? b. A wastewater discharges to Puget sound, a mari
The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c
Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of
Cleaning and greasing of Rocker & Roller bearings of open web through girders : In case of standard open web through girders, no separate jacking arrangement is required as the en
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd