Q. Explain Census of Traffic at Level Crossings?
Periodical census of traffic at all level crossings, unmanned/manned should be taken at least once in five years to review the classification, in the case of manned level crossing and need for manning in the case of unmanned level crossing. However, for manned level crossings with traffic density 75000 TVUs or more but less than 1 lakh TVUs, the census should be taken up once in a 2-1/2 years to determine their eligibility and priority for replacement with ROBs/ROBs on cost sharing basis. The total train vehicle units/day (Train units ´ vehicle units) are worked out taking the census for a week. Train, motor vehicles, Bullock carts and Tongas being considered as one unit. Cycle rickshaw/ Auto rickshaw being considered as half unit.
A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can
moment
Question In linking fenders to pier organizations, would single lock nuts or double lock nuts be used? Answer In pier structures connection offenders to piers is a
What is Specific Energy Applying the Bernoulli energy equation in open channel flow results in Z = 0 (channel bottom or datum), the pressure head (p/γ) = d, and the velocity he
The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr
Question For underwater concreting, tremie pipes are normally used with aid of hoppers. From time to time tubes are put in inside the hoppers and with reasons? Answer
WHAT IS FLYBBACK LEVELLING
Write definition of the following - (i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( v
1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su
Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd