Primary effluent wastewater at 60oF (v = 1.217 x 10-5) is pumped to the top of a trickling filter (TF) a total of 75 vertical feet through schedule-40 welded steel pipe. The flow rate is 8.64 mgd (6,000 gpm). The suction piping is 24 in diameter straight piping (velocity of 4.8 fps), has a length of 10 ft and an energy loss of 0.03 ft. The discharge piping is 18 inch diameter (velocity of 8.6 fps), has a length of 177 ft and an energy loss of 3.6 ft. The total length of the suction and discharge piping is 187 ft. Minor losses exist in the discharge piping only and total an equivalent length of 137 ft. The wet well and TF distribution arms are open to the atmosphere. The pump efficiency is 85%. 1.  Determine the head added by the pump hA:

1. Determine the head added by the pump hA:

hA = (PD/γ - PS/ γ) + ( v2 D/2g - v2 S/2g) + ZD - ZS + hf ZD - ZS = 75 ft

v2 dis/2g = (8.6) 2 /64.4 = 1.15 ft v2 suc/2g = (4.8) 2 /64.4 = 0.35 ft

total hf = 0.03 ft + 3.6 ft = 3.62 ft

hA = 0 + (1.15 ft - 0.35 ft) + 75 ft + 3.62 ft = 79.4 ft

2.  Determine the hydraulic horsepower required:   

whp = hAQ(sp gr)/3956=((79.4 ft)(6000 gpm)(1))/3956 = 120 HP

3.  Determine the brake horsepower required:

bhp = whp/pump efficiency = 120 HP / 0.85 = 142 HP

4.  The friction or heat horsepower is

bhp-whp = 142 HP - 120 Hp = 22 HP


Related Discussions:- Determine the head added by the pump

Open channel, design of irrigation channel permissible velocity table

design of irrigation channel permissible velocity table

Requirements of good building stones , Requirements of Good Building Stones...

Requirements of Good Building Stones          Here described requirements of good building stones: Strength: The stone should be capable to resist the load coming on

Differences between pipe jacking and micro-tunnelling, Q. Differences betwe...

Q. Differences between pipe jacking and micro-tunnelling? Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked f

Career, does felid scope in civil eng. if we start consiltancy job

does felid scope in civil eng. if we start consiltancy job

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Differentiate, differentiate between components and resolved parts

differentiate between components and resolved parts

Civil Engineering, I. A horizontal 500 lb force acts at a point D of cranks...

I. A horizontal 500 lb force acts at a point D of crankshaft AB which is held in static equilibrium by a twisting couple and by reactions at A and B. Knowing that the bearings are

Kicker of reinforced concrete cantilever retaining walls, Q. Kicker of rein...

Q. Kicker of reinforced concrete cantilever retaining walls located at the position of largest moment and shear force - why? Generally for reinforced concrete cantilever retai

Harbours - water transportation, Harbours: Types of Harbours ...

Harbours: Types of Harbours There are two types of harbours, viz : (a) Natural harbour, which is protected from storms and waves by the natural configuration of t

Benefits of analysis of prestress and bending stresses, Normal 0 ...

Normal 0 false false false EN-IN X-NONE X-NONE

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd