Explain about catch sidings, Civil Engineering

Assignment Help:

Q. Explain about Catch Sidings?

Normally all catch sidings except those which are sanded shall be kept alive. On sanded catch siding, the rails shall be kept clear of sand for a length of 21.5 metres, beyond the section insulators in the overhead lines and the switches controlling the sanded catch sidings shall be kept in the neutral position. If an electric engine or single or multiple unit train runs into the sanded length of a catch siding, it may possibly be insulated from earth except through the buffers or couplings if connected to other vehicles, therefore these sidings shall not be made alive when an electric engine or single or multiple unit train or any vehicle coupled thereto are standing in the sanded tracks until all staff have been moved away from positions where they are likely to make contact between the permanent way formation and any part of the locomotive or single or multiple unit train or coupled vehicles. No person shall attempt to enter, or leave or in any other way make contact between the permanent way formation and the electric engine or single or multiple unit train or any vehicles coupled thereto while the overhead equipment of the sanded length of siding is alive.


Related Discussions:- Explain about catch sidings

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Boundary ratio of weight of hammer to weight of pile, Question If n a n...

Question If n a number of codes, they boundary ratio of weight of hammer to weight of pile for pile driving. What will be the key reason for this? Answer As a hamm

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Explain the classification of solid waste, Explain the Classification of So...

Explain the Classification of Solid Waste  Solid waste can be classified in several different ways.  Putrescible waste - Animal and Vegetable waste From Cooking and

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Immersed tube method for underwater crossings, Immersed tube method for und...

Immersed tube method for underwater crossing includes the following basic construction steps: (i)  Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi

Timber, defects in timber?

defects in timber?

Determine the cost of compensation, The soil in a borrow pit has a void rat...

The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd