Define the Abrasion - underwater inspection of bridge?
Abrasion damage is caused by continuous action of external forces on the surface of the concrete element. Erosive action of silt-laden water running over a concrete surface can cause considerable abrasion damage to concrete piers and piling. In addition, concrete surfaces in surf zones may be damaged by abrasive action of sand and silt in water.
According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist
Resultant force at a section We can determine stresses at top and bottom fibres, at a section of a beam, due to pre-stressing force and external loads. Using them, we can draw
Phases are usually identifiable because of adifference in density which causes gravitational separation. e.g. Ice floats on water, steam rises.
m25 mix water cement ratio
Q.- Explain the Unit hydrograph Method for estimation of peak flood discharge in a river. Ans.- Unit hydrograph Method A hydrograph is a representation of hydraulic cha
Explain briefly shallow foundation?
Compute the thermal stresses in steel: Consider the compound bar shown in below figure consisting of a steel bolt of diameter 18 mm, surrounded through a copper tube of outer
I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA
Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purp
A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd