Estimate future capacity requirements, Mechanical Engineering

Assignment Help:

Estimate Future Capacity Requirements:

An electronic packaging centre operates 250 days per year, with one eight hour shift. Management believes that a capacity cushion of 15 % is best. Currently it has three packaging machines. Find out how many machines are required at the packaging centre.

 

1129_Estimate Future Capacity Requirements.png

 

Solution

M = [2000 ( 0.5 )+(2000/20) ( 0.25 )] client X + [6000 ( 0.7)+(6000/30) ( 0.40)] client Y /  (250 days /year ) (1 shift/day) (8 hours /shift) ( 1 -(15/100))

= 5305/1700

= 3.12 ≈ 4

Rounding up to the nearest integer gives a requirement of four machines.


Related Discussions:- Estimate future capacity requirements

Fourth gear position - shifting of gear, Fourth Gear Position: When g...

Fourth Gear Position: When gear M4 on the main shaft is in mesh with gear C4 on the countershaft then this is known as fourth gear position. The free gear M4 rotates with the

Where a and b are positive constants, Assume the production function is giv...

Assume the production function is given by the following equation (where a and b are positive constants): Q = aL+bK. What is the marginal rate of technical substitution of labor fo

Clutch cable model- gear complaints, Clutch cable model: Ensure the cables...

Clutch cable model: Ensure the cables fitted is of the respective model and not interchanged with other model. Also ensure that the cable is genuine.

Composities, example with its properties

example with its properties

Cad - requirements for standard interface, Requirements for Standard Interf...

Requirements for Standard Interface  The interface must be capable of handling all kinds of manufacturing data. There should be no information loss when data is transf

Resistance seam welding, Resistance Seam Welding This is similar to spo...

Resistance Seam Welding This is similar to spot welding except that the copper alloy electrodes are in the form of circular rollers. The overlapping sheets are held under const

Explain the function of the foundation, Explain the function of the foundat...

Explain the function of the foundation The function of the foundation is to ensure that the loads on the super structure are transmitted to the soil below the foundation withou

Time and cost analysis, Time and Cost Analysis This discusses about ce...

Time and Cost Analysis This discusses about certain basic activities that must be carried out in a factory to convert raw materials into finished products. These activities br

Show conceptual layout of plant, Q. Show Conceptual Layout of plant ? D...

Q. Show Conceptual Layout of plant ? During the Evaluate phase of a project, the early concept design considers broad information of the expected installation, and its basic cr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd