Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#

Related Discussions:- engineering economics

Darwing, construction the ellips in all method

construction the ellips in all method

Explain in brief about the term - anchorage, Explain brief about the term -...

Explain brief about the term - Anchorage A device used to anchor tendons at the end of a concrete member is called as an anchorage in the case of post-tensioned concrete. In th

Define underwater magnetic particle testing, Define Underwater Magnetic Par...

Define Underwater Magnetic Particle Testing? Underwater magnetic particle testing (UWMT) is a non-destructive testing suited for detection of surface cracks or discontinuities

Precaution of damp, i need simple ans for this question tell me precaution ...

i need simple ans for this question tell me precaution of dampness

Magnitude of torque - bending moment, Magnitude of torque - bending moment:...

Magnitude of torque - bending moment: A prismatic bar of hollow circular cross-section along with outer and inner diameters 100 mm and 80 mm correspondingly, carries a bending

Integration of the strain settlement, All soils subjected to stress undergo...

All soils subjected to stress undergo strain. This will be taking place within the soil skeleton. This strain is caused by rolling, slipping, sliding and crushing at the particle c

Basic, what you mean by civil engineering

what you mean by civil engineering

Lock entrance - docks, Lock Entrance: Wet docks have lock entrances to...

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha

Seismic joints, is the seismic joints like falling joints ? thanks :)

is the seismic joints like falling joints ? thanks :)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd