engineering economics, Civil Engineering

Assignment Help:
Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#

Related Discussions:- engineering economics

What is long welded rail, Q. What is Long Welded Rail? Long Welded Rail...

Q. What is Long Welded Rail? Long Welded Rail is a welded rail the central part of which dose not under go any longitudinal movement due to temperature variation, normally a le

Calculate the monthly payment for home mortgage, Your home mortgage is $300...

Your home mortgage is $300,000 for 30 years with a nominal annual rate of 7%. The monthly payment is most nearly: Solution: n = 360 months interest = 7%-annual ÷ 12-months/year

Estimate total dissolved solids, Estimate total dissolved solids, Alkalinit...

Estimate total dissolved solids, Alkalinity and Hardness A sample of water from Brazos River at Brenham was collected and analyzed for water quality characteristics and the dat

Influence of pressure in the soil, Q. Influence of Pressure in the Soil? ...

Q. Influence of Pressure in the Soil? Figure shows the stress state beneath a footing. The steady state situation prior to footing as well as qualitative variation of pressure

Determine the stage of cracking moment of pre-stress, Determine the stage o...

Determine the stage of Cracking moment of pre-stress  At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight

Influence line, determine the maximum positive and negative shear shear

determine the maximum positive and negative shear shear

Measurements, Explain the concept of average velocity

Explain the concept of average velocity

Embankment, Describe the various steps in embankment construction.

Describe the various steps in embankment construction.

What is the cost of phoenix activity, Q. What is the cost of phoenix activi...

Q. What is the cost of phoenix activity? Phoenix activity has a range of impacts on the Australian economy. Employees lose entitlements when phoenix activity has occurred and w

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd