Question

Should reversible moisture movement be taken into account in estimating movement for movement joints?


Answer

Size of concrete is affected by changes in distinctive humidity- moisture reasons growth although drying causes shrinkage. Such humidity movement is reversible. This is entirely different from aeration shrinkage in which concrete slowly loses humidity during hardening, thus causing irreparable reduction.

In fact, variation of humidity and estimated reversible moisture movement is not significant (about 30 percent) and so, its contribution to group does not validate for group joints .

 


Related Discussions:- Estimating movement for movement joints

Find a suitable slab thickness, The continuous one-way slab shown below is ...

The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k

Write short note on stock verification, Q. Write short note on Stock Verifi...

Q. Write short note on Stock Verification? It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordin

Dense Bituminous Macadam, What is DBM?Why use DBM where other binder course...

What is DBM?Why use DBM where other binder courses are available?What is composition and advantages of using DBM?

Calculate the change in volume, Calculate the change in volume: If the...

Calculate the change in volume: If the bar is 1 m long with rectangular cross section of 300 mm deep and 400 mm wide, compute the change in volume of the solid because of a lo

Workshop drawings, Workshop Drawings  (Contractor Scope) 1. Air Co...

Workshop Drawings  (Contractor Scope) 1. Air Conditioning and Ventilation Systems: Builder work drawings Enlarged scale double line HVAC System Duct & piping layouts

Determine concentration of total solids and volatile solids, The following ...

The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant.  The tests were performed using the standard methods. Dete

Working from whole to part in survey, a clear illustration about working to...

a clear illustration about working to part principle and some examples

Determine the thermal stress in the bar, Determine the thermal stress in th...

Determine the thermal stress in the bar: A stepped bar made of aluminum is held between two supports. The bar is 900 mm in length at 38ºC, 600 mm of which is having a diameter

Determine the ultimate bearing capacity of a square footing, Determine the ...

Determine the ultimate bearing capacity of a square footing, 1 m × 1 m, resting on saturated clay of unconfined compression strength of 180 kN/m 3 and a bulk density of 18 kN/m 3

Illustrate the types of prestressing, Illustrate the types of prestressing ...

Illustrate the types of prestressing we can classify prestressing into two forms  : (a)  longitudinal prestressing, and (b)  circular prestressing.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd