Estimating movement for movement joints, Civil Engineering

Assignment Help:

Question

Should reversible moisture movement be taken into account in estimating movement for movement joints?


Answer

Size of concrete is affected by changes in distinctive humidity- moisture reasons growth although drying causes shrinkage. Such humidity movement is reversible. This is entirely different from aeration shrinkage in which concrete slowly loses humidity during hardening, thus causing irreparable reduction.

In fact, variation of humidity and estimated reversible moisture movement is not significant (about 30 percent) and so, its contribution to group does not validate for group joints .

 


Related Discussions:- Estimating movement for movement joints

Smallest size of a325 bolts needed for two plates in tension, What is the s...

What is the smallest size of A325 bolts required for the two plates in tension noted below, assuming the thickness of each plate is 1.0-in. and the applied force at each end is P=2

Continuous flow systems, Continuous Flow Systems: Transport by road, r...

Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those

Coatings at the back faces of abutments, Q. Coatings at the back faces of a...

Q. Coatings at the back faces of abutments? There are many views on the necessity of application of protective coatings (can be in the form of two coats of paint) to the back f

Concrete, types of concrete and its uses

types of concrete and its uses

Advantages of continuous multiple-span deck, Q. Advantages of continuous mu...

Q. Advantages of continuous multiple-span deck over simply supported multiple-span deck? Movement joints are generally added to bridge structures to accommodate movements bec

Why we need transition slabs in bridges, Q. Why we need Transition slabs in...

Q. Why we need Transition slabs in bridges? In a number of designs, transition slabs are provided on the approach to bridges. For example soils in embankment supporting the ro

Roads, difference between BM and BC in black topping

difference between BM and BC in black topping

Designing of access ramps for drainage channels, Question Designing of ...

Question Designing of access ramps for drainage channels, why must direction of access ramps is sloping down on the way to downstream ? Answer In designing of access

Determine the flow rate from the dewatering well, A construction project in...

A construction project involves excavation below grade. A 24 inch diameter dewatering well is installed from grade (EL 586) to 80 ft below grade to lower the water table. Soil bori

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd