Estimating movement for movement joints, Civil Engineering

Assignment Help:

Question

Should reversible moisture movement be taken into account in estimating movement for movement joints?


Answer

Size of concrete is affected by changes in distinctive humidity- moisture reasons growth although drying causes shrinkage. Such humidity movement is reversible. This is entirely different from aeration shrinkage in which concrete slowly loses humidity during hardening, thus causing irreparable reduction.

In fact, variation of humidity and estimated reversible moisture movement is not significant (about 30 percent) and so, its contribution to group does not validate for group joints .

 


Related Discussions:- Estimating movement for movement joints

Which are the colloidal impurities in water, Q. Which are the Colloidal Imp...

Q. Which are the Colloidal Impurities in water? The finely divided particles of soil such that their small quantities are not Visible to the naked eye are

Draw the shape of the pressure line, Draw the shape of the Pressure line. ...

Draw the shape of the Pressure line. Solution The locations of resultant force at sections A-A, B-B  and C-C have already been determined. Joining these locations, we can dr

#surveying & levelling, expressions for calculating corrections for earth c...

expressions for calculating corrections for earth curvature

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

What is the design mix concrete, What is the Design Mix concrete Determ...

What is the Design Mix concrete Determination of  the proportions of  cement, aggregates and water to  achieve the required strengths in concrete is made by designing  the  con

Determining the amount of pre-camber, 1. Domes - You are a construction man...

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

Explain the term- shrinkage of concrete, LOSS OF PRESTRESS DUE TO SHRINKAG...

LOSS OF PRESTRESS DUE TO SHRINKAGE OF CONCRETE We know that concrete shrinks in volume when it dries up. This volume reduction takes place in the form of reduction of all dime

Determine the flow area of storm water, Storm water flows at a depth of 4 f...

Storm water flows at a depth of 4 ft in the natural channel as shown in the figure. The channel has a slope of 0.0l ft/ft and n = 0.025. 1. Determine the flow area:

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd