Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Determine the maximum uniformly distributed load, Determine the maximum uni...

Determine the maximum uniformly distributed load: A timber beam 150 mm wide & 300 mm deep is supported simply over a span of 4 m. determine the maximum uniformly distribute

Drive the expression for critical pressure ratio, Drive the expression for ...

Drive the expression for critical pressure ratio for steam nozzle and illustrate critical pressure. Air flows in a 200cm 2 duct at a velocity of 180 m/s, a pressure of 119 KPa

Cylinder head de-carburising and valve lapping, Cylinder Head De-carburisin...

Cylinder Head De-carburising and Valve Lapping: Cylinder head mounts on the top of the engine cylinder, the inner side of the cylinder head is always in direct contact of combusti

Evaluate the support required by body on plane, Evaluate the Support requir...

Evaluate the Support required by body on plane: A body having weight 50KN rests in limiting equilibrium on rough plane, whose slope is 30º. The plane is raised to a slope of

Deficient frame and redundant frame - truss, Deficient Frame and Redundant ...

Deficient Frame and Redundant Frame - truss: Deficien t Frame: If the numbers of member in the frame are less than (2 j -3), then the frame is called as deficient fr

Compare otto cycle with diesel cycle, Compare otto cycle with Diesel cycle:...

Compare otto cycle with Diesel cycle: Sol.: These two cycles can be compared on the basis of either the same compression ratio or the same maximum pressure and temperature.

What do you mean by dilution method, Q. What do you mean by Dilution method...

Q. What do you mean by Dilution method? Dilution methods are more suited especially in hilly streams and torrents where current meter measurements are not feasible on account o

Belts, crowning of pulley

crowning of pulley

Atomic hydrogen welding, Atomic Hydrogen Welding In this process, an a...

Atomic Hydrogen Welding In this process, an arc is struck between two tungsten electrodes using AC power supply.The Streams of hydrogen gas are passed from orifices around the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd