Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Basic concept of servicing and maintenance, Basic Concep: Proper care and ...

Basic Concep: Proper care and maintenance are essential for trouble free operation and optimum performance of the motorcycle. A quality service at regular intervals ensures that e

Stiffness properties in composite materials , There are five elastic proper...

There are five elastic properties needed to represent the elastic behaviour of a unidirectional laminate under in-plane loading, but only four of these are independent. The five

Benefits of registration in entrepreneurship development, Benefits of Regis...

Benefits of Registration: Units would normally get registered to avail some benefits, incentives or support given either by the Central or State Govt. The regime of incentives off

Cast al alloys, Cast Al Alloys Low melting temperature, good surface f...

Cast Al Alloys Low melting temperature, good surface finish and insolubility to gases except H 2 are characteristics of these alloys. Significant drawback of cast aluminium a

What is the difference between mis and erp, MIS MIS:- Management Infor...

MIS MIS:- Management Information System Produces reports on user demand MIS is use for the Decision making reports It Collect data form of all department then produce

Tom, velocity ratio is 3 .pinion has 40 teeth. what would be the gear no of...

velocity ratio is 3 .pinion has 40 teeth. what would be the gear no of teeth?

Shear force and bending moment of simply supported beam., #questicalculatio...

#questicalculation of shear fon\rce and bending moment..

Thermodynamics, Show that heat is a path path function and not a property...

Show that heat is a path path function and not a property of system

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd