Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Illustrate the electromagnetic clutch, Illustrate the Centrifugal Clutch in...

Illustrate the Centrifugal Clutch in Detail with neat sketch ? Illustrate the Electromagnetic Clutch in Detail with neat sketch ? Illustrate the Diaphragm spring Clutch in

Applications and disadvantages of electro chemical machining, Applications ...

Applications and Disadvantages of Electro Chemical Machining Disadvantage of Electro Chemical Machining 1. The tools are more difficult to design. 2. Initial cost is hi

What is clad plate and overlay welding, Q. What is Clad plate and overlay w...

Q. What is Clad plate and overlay welding? Strip back cladding on clad plate a minimum of 5 mm (3/16") from the edges of weld preparation before welding on the backing plate.

Beam reactions, i would like to know how much it would cost to for my assig...

i would like to know how much it would cost to for my assignment without the actual graphs but the dimentions and without the assignment being converted into a word document as lon

Mechanical efficiency, The following data were obtained from a test on a si...

The following data were obtained from a test on a single cylinder, double acting steam engine fitted with a rope brake. Cylinder diameter 200mm Stroke 250mm Speed 5rev/min Effec

Firecracker welding, Firecracker Welding This is a semi automatic vers...

Firecracker Welding This is a semi automatic version of SMAW. A specially designed heavy - coated electrode, which can be of any length upto 2 m, is laid on the seam of a groo

Hartung governer., #quesThe spring controlled governor of the “Hartung” typ...

#quesThe spring controlled governor of the “Hartung” type has two rotating masses each of 3.5 kg and the limits of their radius of rotation are 100 mm and 125 mm. The each mass is

Power sources-modern arc welding power sources, MODERN ARC WELDING POWER SO...

MODERN ARC WELDING POWER SOURCES Recent advances in the field of solid state power electronics have helped to improve the status of welding power sources. With the development rel

ESSENTIALS OF PROJECT MANAGEMENT, Ask qu1. A small maintenance project cons...

Ask qu1. A small maintenance project consists of the following 10 jobs, whose precedence relationships are identified by their node numbers: JOB NODE NUMBERS ESTIMATED DURATION (DA

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd